There likely is more concrete removed beyond the area. I wish the camera was panned a little more to the left. LOL! If it is for utilities, I think we will see construction crews dig deeper to place the utility lines.
I don’t know for sure if the construction crews are done removing the concrete in the area, but it appears that only a specific section of the concrete was cut out with how clean the cut lines are. I don’t know why Kings Island would only remove some of the concrete and not all of it, but it is interesting.
This is the direction the chain has been slowly moving, Kings Island is not the first Cedar Fair park to get rid of the Fast Lane plus option and I doubt it will be the last. If I am correct only 3 parks in the chain still have two separate tiers, and there is enough time left for more parks to make this change this year.
I had the pleasure of interviewing him for the book in October 2020. He was a great storyteller and very enthusiastic about the book! I kept in touch and was able to meet him in person at Cedar Point on his last day there before he retired. Very sad to hear that he passed.
I seen alot of people going up and upgrading to the Plus when they found out they need that for all rides. But I bet they will sell Fast Lane at the higher price that Plus was. Sent from my SM-G986U using Tapatalk
They are the epitome of the saying "Corporate sense and common sense are often on completely different sides of the spectrum".
They are also walking and talking examples of another saying a very wise former poster used to have... "They already have your money".