Jump to content

CoasterDude48

Members
  • Posts

    21
  • Joined

  • Last visited

CoasterDude48's Achievements

KIC Tourist

KIC Tourist (1/13)

94

Reputation

  1. The lift hill for Fury 325 was topped off in early December of 2014. I would suspect our Giga will have a similar timeline of construction
  2. When researching the crater Chicxulub and the asteroid that made dinosaurs go extinct, I found this mission executed in 2016 (around the time that this roller coaster project would’ve been forming) that I thought sounded interesting. It also may just be my optimism that the height will be 350+ feet.
  3. Also regarding the clues this morning, could the page numbers hold any significance? I first thought it was odd that it began at Page 08. It looks like the destruction of the binder was due to a shredder versus removing pages. Also I thought it was odd to have it as Page 08 rather than Page 8. That made me think that the page titled ‘Welcome to Project X New Hire’ could reference something in 2008. That was a year that a lot of CF changes were made apparent in the park as well as the year that DB was announced. I don’t know if that could be something as simple as saying that B&M was the ‘New Hire’ for KI in 2008 and is also working on Project X or maybe something deeper. Here was an old video I found after doing some minimal research that explains some of the things going on in 2008
  4. I think the picture of the "major key" that showed the splashdown could hint a dive coaster. Griffon at BGW has a splashdown and has a 200ft+ drop like DB as seen in the picture Sent from my iPad using Tapatalk
  5. I'm not saying I would be upset. By no means would I say "Dang we got a helix-like roller coaster". I'm just saying that I would prefer a Giga Coaster over anything else
  6. I feel the same way. I am fine with just having The Racer and The Beast at Kings Island. That is enough wooden coasters for me. However, we don't have anything like a Giga Coaster.
  7. I am on both sides of the argument then. I am one who wants a Giga at Kings Island, but I don't think they will be receiving one in 2017
  8. I still think that a Giga is the biggest gap in the KI roller coaster line up. The Beast and Racer can suffice my wooden roller coaster needs Sent from my iPhone using Tapatalk
  9. Any bright color. Green would be my favorite. Maybe resembling the bright green that is in the color scheme of Fury325
  10. I agree. By August it will have been 3 months since the falling trees poster was put up. This is plenty of time to hype a good ro-oh I mean ride or attraction coming in 2017 Sent from my iPad using Tapatalk
  11. If they announce on August 1st, that brings it down to 324. However, the pages will likely speed up when there is more evidence for a certain type of ride or roller coaster
  12. If my calculations are correct, considering Kings Island will announce the ride on the last day of the season, and that we continue at our current pace (12 pages/4 days), this thread will reach 594 pages.
  13. A launched winged coaster by B&M could be possible if it is a coaster. It could be themed to a bird. That can relate to trees. It may be that the bird is upset that the trees are being chopped down. Sent from my iPhone using Tapatalk
×
×
  • Create New...