  1. On 9/28/2018 at 11:07 AM, gforce1994 said:

    It was conceived early on. The docs I have are from 97-99, and they're pretty interesting. The 96 docs indicate that the park would get an Intamin Launch Coaster in 98, water park expansion for the next two years, the proposed flyer in 01, the RCCA Wooden Coaster (listed as Hyper) in 02, and Drop Zone in 03. There were other undated projects as well, such as a new multilevel go-kart area and a Star Trek attraction. Only 2 of the proposals that were anticipated in early 1997 did not see the light of day, and those were the 01/02 expansion projects. The fascinating thing is the 01-02 projects nearly saw the light of day. I knew the story told by @Shaggy  was true since KD was well on their way on developing the flyer as well. The flyer would have been tucked into the area besides Grizzly and the wooden coaster would have been on the far side of the park along the interstate. However, when Paramount axed the flyer project for KD, they needed a roller coaster to fill the gap. They relocated the CGA S&S coaster to KD, and installed Apple Zapple (then Richochet) the following season. 

    The fascinating thing was that the wooden coaster proposal was the second giant wooden coaster project canned by KECO/Paramount in the 1990s. The first one would have been a giant Dinn coaster over where The Bat stands today.

    I should also add, that Great America had their fair share of dropped proposals. There was a concept called the "Brady Bunch Groovy Train" Morgan Coaster that involved two elevator lifts. The ride was supposed to go in the plaza across from where RailblaZer stands today. The ride had an elevator take riders up 201 feet, before they dropped 201.1 feet. Riders would then encounter an 157 foot airtime hill, 143 foot heavily banked turn (like on Phantom at Kennywood), 112 foot airtime hill, 20 foot hill, and then a 100 foot curving hill into the brake run elevator which took riders back to ground level.

    I would like to see these documents! They could be an interesting read.

    • Like 1
  2. RMC Gwazi will be getting a name on September 12! In the meantime, here's a picture of construction, courtesy of BGT:

     

    Busch Gardens shares image of the first track pieces installed