  1. 2 hours ago, BSBMX said:

    You have 100% better visibility than I do, but my guess is they're pouring the piers, not footings (piers being the ~10-30' deep concrete/rebar underground sections).

    For the footings, they'll need the piers completed first and 'molds' around those piers for the footings to be poured into, with above-ground rebar and anchor bolts set to accept the support columns.

    That is what I meant lol. I used the wrong word

    • Like 1
  2. 35 minutes ago, Turtlepower said:

    Kind of weird to use it for staging when there's still going to be a fair amount of old Firehawk land available, but what do I know? Could be the bathrooms.

    Remember the Leaked Prints could be fake.  And the ride may actually use the Firehawk area

    • Like 2
  3. 3 hours ago, shizzzon said:

    And... kid you not, I rode the coaster on the Daytona boardwalk 1 month before it derailed and fell off the track hurting those people last year.. the maintenance was so obsolete, they had to physically push us to the chain lift...

     

    It was at this point, pulling out my phone and calling a lawyer wasnt a bad thought before I go down the first drop.

    I was in daytona right by the boardwalk when that happened. My mom called and thought I was on it lol

    • Like 2
  4. 1 hour ago, RuthlessAirtime said:

    If anyone decides to go to the municipal building to search for more, try to ask if you can see blueprints filed by KI in like the last month. I only asked for Project X because someone mentioned that as a code name here.

    I went this morning at 8 am. I didnt ask for all KI blueprints from the last month but I did say “I heard I can get the blueprints for KI new coaster” then I was handed the same document you were given

    • Like 4
  5. Great post @RuthlessAirtime ive been driving for 2 hours trying to think everything through and all the possibilities and i couldnt even figure out where to start. I do have a question though.  If these leaked plans were real would we be able to find information on if Kings Island or b&m filed a lawsuit against the person for breaking NDA?

    • Like 3
  6. 1 minute ago, Ben43065 said:

    I mean it’s always possible but I don’t know how easy it is to A - Get such a current blueprint of the area with that much detail and B - Make the overlay like that.

    This might sound crazy but what if Kings Island is just trolling us

    • Like 6
  7. I have a feeling these blue prints are fake...  It's highly unlikely that right as soon as someone posts the blue prints someone immediately posts a map with terrain and the exact layout etc..  Seems like someone made and had that ready and was just waiting for the right moment to post it to start a lot of things

    • Like 6
  8. 6 minutes ago, LovinMeSomeBanshee said:

    This is absolutely a giga.  It’s far more likely that we’re getting a giga with incorrect scaling on the blueprints than we are to get a 150 foot-tall coaster with giga supports, footers and track.  Come on guys.

    I agree with you on the giga supports.  It does not make sense. The picture I posted on pg. 57 of my math was based off of the scale.  I was simply showing how to solve for the height and length of the lift.  and showing how I got my answer.  I agree that the Giga supports ,and the height I of the lift hill I got, do not match the support style or make sense.

    • Like 1
  9. Personally I feel it should not get shared.  This thread will die if it did.  There would be no more decoding no more hype, nothing.  I'm not saying it wouldn't be amazing if we got the full plans now because it would be awesome, but it would completely ruin the speculation and teasers and whatever else the park wants to do

    • Like 3
  10. according to the scale it says roughly 150 ft long horizontally.  If you have a right triangle with a 45 degree angle. sides A and B will be the same.  So if the length horizontally is 150 the height vertically will also be 150. then the length of the lift hill will be 212 ft long.  I am confident that my math is right,  if the scale is right.Photo on 5-8-19 at 5.57 PM.jpg

    • Like 2
  11. 1 minute ago, silver2005 said:

    Are you making those lift length predictions going on a straight line?  This thing is going to be going up at a 45 degree angle.  The elevation change will probably add more length.

    If you find the length of the base of the lift hill (so the horizontal length running from start of lift hill to the end of lift hill). you can use trigonometry to figure out the lengths of the other side. because you already have the 45 degree angle measure

    • Like 1
  12. Just now, Kenban said:

    Maybe, look to the right a little bit under partial foundation plan.  There it says 1 inch is equal to 20 feet.  If that 40 foot scale was only 2 inches long I think the page would have been tiny.  Like I said I think there is something wrong here.  This is why I want a copy of the coordinates page with enough resolution to actually read it.

    But either this is not a giga or 100% there are mistakes on the plans.

    agreed.  we need a clear copy of the coordinates.  No way this is a giga unless the scale is wrong

    • Like 1
  13. Just now, Bansheeback said:

     

    Wing coasters don’t have those types of supports. Especially at that height. Nothing says these are to scale and it’s too early to judge height just based on what we have.

    There is a scale on the prints though that indicate the length.  1"=20ft in the drawings

    • Like 1
×
×