Jump to content

Kingshaven

Members
  • Posts

    139
  • Joined

  • Last visited

  • Days Won

    1

Everything posted by Kingshaven

  1. It;s funny we've been waiting weeks and months for Orion's lift hill to start and now that the first major pieces have been erected, this place is quiet as a mouse..lol.
  2. Yeah I see that they have moved. Guess we'll know when we r suppose to know
  3. I dont think they would be hauling it out. They could just move it around and refill once clifford has moved from that area
  4. They have been hauling dirt out of that area all day... dont know whats going on there
  5. Yeah they have been trucking it out all day. Things that make u go HMMM
  6. They brought more dirt or gravel to use at the excavation area today. OR maybe they are taking dirt out to relocated elsewhere. I looks like the excavator is loading the truck now IDK why they dont start pairing 2 pieces with all the accessories beside each other. A cherry picker could move the stuff around. That was they are assembled and waiting
  7. true CS was a very complex and congested coaster but as for a live stream video of its construction in hyper (not giga) mode gives an idea of construction time etc. I dont know if there is a vid similar to that for Levi. If I find 1 i'll pass it on. ok what about Fury once these pieces are up it will be a few days b4 we see any more pieces being erected IMO because it will take at least a day to put the pieces together. By then we might see clifford on the job site
  8. Yeah I cant figure out why they are moving so much dirt at this time. I really wish the camera was hd so when we blow up the pics we could actually see them in clarity go watch the copperhead live stream and see how long it took to build that coaster and that will give u an idea of how long it will take
  9. They wont start attaching till after lunch as it will take hours to get it self sufficient
  10. Company or Ki should supply them with go pros
  11. RMC posted this 12 hours ago. She's a beauty (and they asked permission to use pics lol)
  12. I speculating that Clifford along with an additional crane will be here later this week or early next. Will take a little time to assemble Clifford. Todays progress will kinda determine the timeframe
  13. They are probably getting everything ready for tomorrow. Its too late in the day to start something like that
  14. ok.. well that piece has been brought to the forefront sometimes during the day
  15. lol true but this is the bottom piece of a 287 foot lift
  16. Thats probably all they are gonna do today. Thats an important piece that they has to make sure they have it right
  17. It will break records like Orion is,,,,,,,,,,,,,,Oh Wait
  18. I really wish the camera was a higher resolution and was zoomed in more. Since when we enlarge pics from the cam they are blurry n kinda hard to make out. Ohio Valley Coasters has some really clear pics n videos
  19. They will need at least 2 more cranes on site. Watched the erection of copperhead the other day and they had at least 4 cranes in that congested area
  20. We have track going into place at this moment
×
×
  • Create New...