-
Posts
141 -
Joined
-
Last visited
Content Type
Profiles
Forums
Calendar
Posts posted by CedarIslander
-
-
12 minutes ago, JonahWilliamson said:
Sooo anyone wanna take a guess how tall Orion is now? Are we as tall as Vortex today?
Probably pretty close to Vortex. Around 150 maybe.
- 2
-
20 minutes ago, Joshua said:
So we just need to figure out the magic word...
- 6
- 2
-
Webcam has been down 1 day.
Everyone at KIC be like:
It's me... I'm everyone...
- 4
- 8
-
Waiting for webcam to come back like...
- 3
- 1
-
C'mon, KI, Mondays are bad enough... don't make us go all day without the webcam!
- 3
-
12 minutes ago, Nutterie said:
Are you sure? On the camera it looks like we just passed the lift.
Enviado desde mi SM-N960U mediante Tapatalk
I think so... According to the layout, there's 8 supports total for the brake run. And the webcam shows 8 supports installed.
- 2
-
21 minutes ago, Nutterie said:
Looks like we only have 2 track sections on the break run left.
Enviado desde mi SM-N960U mediante Tapatalk
Negative. Those pieces are already in place.
- 4
-
11 hours ago, collin.klopfstein said:
Hope someone gets this reference... lol
- 1
-
Had the craziest dream last night. All the blueprints and promotional materials we've seen for Orion so far were a red-herring. Instead of going straight back by The Beast, the actual layout took a right hand turn and went OVER The Racer and into Vortex's plot of land. Craziness.
Good morning, everyone!
- 3
- 2
-
14 minutes ago, Klabergian Empire said:
My question is what could they possibly use a crane that small for (considering the size of Orion)?
See @DeviousMrMatt's post on the previous page.
- 1
-
-
-
Unpopular opinion time... KI will always be number 2 to CP in my book. It's a close 2nd, but still 2nd.
- 3
-
27 minutes ago, JonahWilliamson said:
I really hope we get at least one but hopefully two sections of lift hill before haunt ends. I cant wait to see the photos of the track sticking out from different angles inside the park.
They've stated that they want the lift hill topped off the first week of November, so I would imagine you'll see more sections of the lift and drop put into place before Haunt ends.
- 2
-
6 minutes ago, JonahWilliamson said:
I really hope we get at least one but hopefully two sections of lift hill before haunt ends. I cant wait to see the photos of the track sticking out from different angles inside the park.
I'm not a Haunt kind of guy... when does it end? Halloween night?
- 1
-
-
-
I would assume that they have everything planned out. There's probably a certain day they want Zeus assembled by, and until then they can do smaller lifts with the other cranes. I could be wrong though.
- 6
-
-
1 hour ago, sixohdieselrage said:
I know it wont look exactly like this (did it on my phone), but still something fun to play with.
Credit to @Beast Night Rider for the webcam pic, and @collin.klopfstein for the track drawing bit.
If this was real, I'd make it my desktop background. (With your guys permission, of course.) Beautiful!
- 3
-
That article says Orion is a $30 million investment... does that price include crane rental?
- 2
-
17 minutes ago, Beast Night Rider said:
Not sure this was already mentioned but in the video from channel 9 yesterday, you can clearly see the long piece of track assembled behind the maintenance shed that we were talking about last week. This is 100% lift hill track with the catwalk already installed. You can see it will be the next piece of the lift hill based on how the catwalk will fit with the existing lift hill track/catwalk that’s already up.
"Don't waste your money!" Does Six Flags own that news station?? lol
- 4
-
-
Orion Construction Photos
in Kings Island
Posted
Happy 100 pages, everyone!