Jump to content

jtgainor

Members
  • Posts

    2
  • Joined

  • Last visited

Profile Information

  • Gender
    Male
  • Location
    Indiana

Recent Profile Visitors

The recent visitors block is disabled and is not being shown to other users.

jtgainor's Achievements

KIC Tourist

KIC Tourist (1/13)

5

Reputation

  1. Yes that is the top height of the hill, but the crest of the "arch" has to be lowered in place, so the track piece could easily be dangling at 300' to clear the workers and the existing track Just finished watching the one done by DOMA if that's the one you're talking about. I really enjoyed the construction process being shown in a semi-decent aspect. I've always been fascinated with these big coaster jobs. Just like giant Lego Technic!
  2. It's not really safe working conditions with the winds today. Between the rain, and the winds a 300' in the air it's quite dangerous. Looking at the forecast, Tomorrow, Friday and Saturday look like the safest days this week to lift. I lay watermain, and with a 10 mph wind, it's hard to lay 12" c900 at times. I could only imagine lifting a 1 ton+ piece of track 280' feet in the air with these winds.
×
×
  • Create New...