Jump to content

TheBEASTunchained

Members
  • Posts

    2,672
  • Joined

  • Last visited

  • Days Won

    3

Everything posted by TheBEASTunchained

  1. Truly a downgrade for Viking Fury. While it is nice to see attention being given to the ride, it was not done properly.
  2. There were other additions as well that added up to the $5 million. And yes, the ride had, to my knowledge, 2 different color schemes while at the park. However, I'm not quite sure if the ride was painted before installation or after. Also a fun tidbit is that the ride was very commonly referred to, even by the park, as just "The Demon".
  3. Based on the pictures, there appears to be two led strips on the bottom of the railing and a blue strip on the top directly under the handrail.
  4. This is exciting! Would be great to see your shots
  5. ^ That doesn't really answer the question that was asked. Obviously almost all wood coasters get some form of work done in the off-season. To answer your question @FUN&ONLY! , don't quote me on this but I believe that GCI was listed on one of the work commencement documents, which could potentially mean that they're being contracted for some of that work. There have also been plastic tunnels over sections of Racer lately for crews to stay warm during some of their jobs, however I'm not sure whether those are KI crews or GCI crews.
  6. I'm pretty sure that the Diamondback cam of today is a completely different camera than the original one that was installed. If I recall correctly, the Diamondback construction cam was not a live camera and was a cam that only updated every few minutes or so.
  7. This is where we draw a line, sir. Terp was one of the most well-informed, if not the most, members of our forums. He never claimed to necessarily have inside knowledge or anything but his knowings of the inside of the industry were deep. A truly missed part of the action here on KICentral!
  8. Personally always been a fan of I-305's supports. They just make the ride look so massive and intimidating (pun partially intended).
  9. The park said in an interview that it’s a 50 degree lift hill. You realize how steep that is, right?
  10. While enthusiasts make up a very very tiny percent of customers, they are a very vocal set of customers, a set that it is usually not wise to mishandle.
  11. Not that Kings Island or Cedar Fair particularly care about preservation and historical legacies of rides when making decisions but.... You guys should take a look at how Efteling retracked most of Python, their Arrow looper, a few years back. KI could've done something similar to the Python transformation with leaving the lift, drop, and brake run while retracking the rest of the ride. By all accounts, Python's retrack was a success and the ride is much smoother now. https://www.efteling.com/en/press/eftelings-python-roller-coaster-with-loops-re-opens-to-visitors/ The park went with a company called CSM Manufacturing, but I've also heard that Vekoma was willing to do the job (presumably with their new track design) but at a much higher cost.
  12. I’ve ridden it quite a bit this season but honestly can’t seem to remember paying attention to whether or not Vortex still has on-ride photos? Was wanting to get a few Sunday. Can anyone clarify?
  13. ^ I have not yet seen the park state anywhere that they plan on “demolishing” or “tearing down” Vortex. If anything, they’ve specifically stuck with the use of the word “Retiring”.
  14. I know many of you are new here, but as CoastersRZ mentioned above, The Interpreter often mentioned this merger / acquisition, and told us that it was on the horizon for sooner than later. He predicted this long ago, and as for his reasoning, it all makes sense now. Just a side note here, but if any of you think this wont happen, you may be right. For now. But it will come back up, and eventually, chances are that this will be a thing.
  15. Someone should check out Kings Island’s tweet from a year ago today....Interesting to say the least....
  16. What are you talking about?? Cincinnati is in the tri-state area. If you aren't familiar with the Cincinnati area, it borders both Kentucky, and Indiana, and is split by the Ohio River. There is nothing "stupid" about the tweet. As anyone familiar with Cincinnati would understand, the connections between Indiana, Kentucky, and Ohio run very deep in the area.
  17. Jersey Devil looks like an outstanding addition for NJFTP. Maybe we could call up Great Adventure and ask them to trade 2020 coasters with us.....
  18. Have had information passed along to me about this piece years ago. Can’t remember much though. If I recall correctly, someone else on this site actually managed to get ahold of one of these many years ago and also had a story to go with it. Finding that thread could be a shot in the dark, as it may have been tucked into another thread and not in its own. Great to see another one of these floating around!
  19. I’d say it’s much better to get a sub-$5 million investment than to get absolutely nothing, as Cedar Fair seems to think is appropriate for their “smaller” parks.
  20. Exactly my thoughts. Really there should be one general thread for all of the Orion construction, updates, and discussion. Trying to sift through so many threads is quite difficult.
  21. Traditionally, the “topping off” of a roller coaster refers to the installation of the highest piece of track. So in this case it would refer to the peak of the lift hill.
  22. A lack of ridership was not the reason for the ultimate demise of The Crypt. The ride was plagued with downtime and many other issues that stem from being an “oversized” prototype. And that’s just skimming the surface. To put it lightly, from my knowledge over the years, that ride was tearing itself up. It was going to have a limited lifespan no matter what. For more information on the demise of The Crypt, I’d recommend reading older forum posts and searching for a bit. These forums contain quite a hefty amount of first-hand knowledge about that ride.
  23. So, just to confirm with everyone. There is only enough room for one more sign on the fence?
×
×
  • Create New...