Jump to content

Gplez90

Members
  • Content Count

    1031
  • Joined

  • Last visited

Community Reputation

5011 Excellent

About Gplez90

  • Rank
    KIC Star Member

Profile Information

  • Gender
    Male

Recent Profile Visitors

1353 profile views
  1. The teasers are seldom accurate when it comes to the fine details. It would be a part of that building, but still be an actual sign instead of a painting. Also, even if it is painted on in the animation, the planning and design team can and does switch things up as the ride is being built, and when final touches are being added. Plus, personally, I believe KI would want a nice, big, beautiful sign to accompany the largest investment in the park’s history
  2. Yes, I was referring to the ride ID sign. Cedar Fair and Kings Island have been on point recently with ride ID signs, so i hope they’re not painting it on!
  3. New drone video shows the area is ver close to completion. Most, if not all of the queue rails have been installed. The area looks awesome! It’ll look even better once the landscaping team reports back to work and gets some grass growing!
  4. When rides began, it was 30°. I remember thinking “how in the world is this thing running so well when it’s so cold?!” It warmed up quite a bit in the afternoon though!
  5. From the looks of it, there is still quite a ways to go. Most of the theming will probably be placed and installed within 2-3 weeks of opening.
  6. Maybe a meteor crater?!?! Wishful thinking.
  7. Search Orion Kings Island on Youtube.
  8. No necessarily. Landscaping could mean mulching, planting trees, putting grass seed down(or whatever they use to make grass grow fast), and putting gravel in some areas. Final painting could be touch up paint on the rails of the ride and other places. Theming could mean installing props, textured/fixed lighting, and sound related items. I’d imagine these responsibilities full under different teams.
  9. What are the chances the drone guy is actually affiliated with the park? Like how people thought Tony Clark was leaking Steel Vengeance construction photos before it was announced? Lol
  10. All CF parks scheduled to open or be open in March have postponed their openings until April. That includes the Schlitterbahn parks.
  11. Guys, this game of Plague Inc. is getting really weird
  12. Was it running along side of the lift hill catwalk?
  13. They could’ve been testing LED flood lights to illuminate the support structure and the bottom of the track on the lift hill. I was referring to the LED strip along the catwalk railing on the lift hill.
  14. You are absolutely right. I’m jumping to conclusions here.
×
×
  • Create New...