Jump to content

Countdown to Opening Day for the 2021 Season: May 15th 11:00 AM!

Kings Island is now open for 2021.

Mystic Timbers Construction Progress


Recommended Posts

  • Replies 2.7k
  • Created
  • Last Reply

Top Posters In This Topic

Top Posters In This Topic

Popular Posts

The first test run was tonight. 

A total of 811 bents were stood to construct The Beast. 

Haunted sawmill, eh?  

Posted Images

If there's an angle they can get of the water area from the train shed, I'd guess a second cam would go there. Especially since that might get them much closer to the construction back there for the tunnel and the run back over to Mystic Timbers's shed.

  • Like 3
Link to post
Share on other sites

My thought process was more on the lines of audience retention lol
If it's once a day, most of the time I wouldn't expect much noticeable progress being made. But once a week or twice a month would allow the viewers to get hit with a good chunk of progress at a time..

But I may have over-thought this hehe

  • Like 6
Link to post
Share on other sites

I really think that whatever is in the shed won't be put in till the shed is built anyway. The interview where the GCI guy said he said he didn't even know what was in the shed pretty much means that it has nothing to do with drop tracks, backwards runs, or anything that would have to be special built by the manufacturer. Unless you think he just lied to everyone. 

  • Like 3
Link to post
Share on other sites

^Agreed.

Wishful thinking here, but a cam from the top of MT's lifthill looking down the hill would be perfect.

I think this is highly unlikely. Running Ethernet all the way up there and then across a construction site to a network connection, is asking for it. Construction will destroy the cable all the time.

  • Like 2
Link to post
Share on other sites
Guest
This topic is now closed to further replies.
  • Recently Browsing   0 members

    No registered users viewing this page.




×
×
  • Create New...