Jump to content

Recommended Posts

I literally LOL'ed at the "Lil Giga" comment earlier from someone.  If it does turn out to be the same as the leaked plan, "Lil Giga" should be the KIC name for it.    

  • Like 2
  • Haha 3
Link to post
Share on other sites
  • Replies 12.5k
  • Created
  • Last Reply

Top Posters In This Topic

Top Posters In This Topic

Popular Posts

So my buddy caught a glimpse of the crew testing the equipment again tonight and this popped up on the screen! Could it be?!?          SPOILER ALERT       S

Ok y’all! It’s time for a vote! Here is the final 4!  Trophy for this one! Heart for This one! Laugh for This one! The 4th option is the above with Mako Purple inste

Posted Images

Hey [mention=11458]RuthlessAirtime[/mention] people on Facebook are still sharing The Beast Unleashed thing thinking it's real. I even just saw a few people I know share it. 


They’ll be in for a surprise haha.


Sent from my iPhone using Tapatalk
  • Like 3
Link to post
Share on other sites

Remember, the only permit we can find that’s been approved is the lift and breakrun area. I’m certain this is the first 3rd of the Coaster. The second third is the rest of the layout that we’ve seen. I’m hoping the last 3rd is some epic twisty sections through the old Dinosaurs Alive area. This is just a theory. Odds are those plans are real and what you see is what you get.

  • Like 4
Link to post
Share on other sites
On 5/9/2019 at 8:49 AM, KI_FAN_4_LIFE said:

For all of the people out there who are holding on to the fantasy that somehow these leaked blueprints aren't legit and we are all part of a huge cover up conspiracy that rivals the moon landing...  

57218860.jpg

Just had to bump this lol

  • Like 2
  • Haha 1
Link to post
Share on other sites

Lil Giga sounds like the name of a rapper... except they’d bring back Linkin Park style nu-metal with rap, but with more electronics (think “It’s Goin’ Down” the X-Ecutioners and Mike Shinoda).

EDITed for spelling

  • Like 4
  • Haha 3
Link to post
Share on other sites

I would not expect any more major clearing at this point.  Those machines and people have already been on site, cleared what they were supposed to cleared and by the pictures above graded the site.  The clearing equipment has likely already been pulled off site and moved to the next project.  The last thing you want to do is mobilize twice on a construction project, get your stuff there, get your work done, get out of the way for the next trades to do their work.  Aside from some light brush clearing; I doubt we see any major clearings for this project moving forward.

It is what it is.

  • Like 6
Link to post
Share on other sites
6 minutes ago, DustinTheNow said:

Remember, the only permit we can find that’s been approved is the lift and breakrun area. I’m certain this is the first 3rd of the Coaster. The second third is the rest of the layout that we’ve seen. I’m hoping the last 3rd is some epic twisty sections through the old Dinosaurs Alive area. This is just a theory. Odds are those plans are real and what you see is what you get.

yep i have to agree here but man my heart cant take any more of this roller coaster of a season and its only the beginning of may... 

  • Like 2
  • Haha 1
Link to post
Share on other sites
36 minutes ago, Hawaiian Coasters 325 said:

Hey @RuthlessAirtime people on Facebook are still sharing The Beast Unleashed thing thinking it's real. I even just saw a few people I know share it. 

Yeah that got out of hand once people ripped it from YouTube and started sharing it on Facebook/YouTube without the unofficial concept disclaimer

  • Like 2
Link to post
Share on other sites
31 minutes ago, sixohdieselrage said:

Not all of it. Excavator still on site. 

20190510_104600.jpg

gotta leave at least 1 around to dig footers.  I imagine footer digging isn't too far behind at this point.

  • Like 4
Link to post
Share on other sites
3 minutes ago, medford said:

gotta leave at least 1 around to dig footers.  I imagine footer digging isn't too far behind at this point.

Aren't most of these drilled piers? I'd expect to see Goettle or Scherzinger out there before any normal spread footings get excavated and poured. 

  • Like 1
Link to post
Share on other sites
49 minutes ago, MDMC01 said:

Lil Giga sounds like the name of a rapper... except they’d bring back Linkin Park style nu-metal with rap, but with more electronics (think “It’s Goin’ Down” the X-Cutioners and Mike Shinoda.

lil gig poster3.jpg

  • Like 3
  • Haha 6
Link to post
Share on other sites
13 minutes ago, calakapepe said:


I personally love the touch of the absurdly high brake run at the end. Shocker.

I like how the Single seat train puts your face in the water at such a speed. Talk about a Splashdown!

 

 

 

  • Like 4
Link to post
Share on other sites
16 minutes ago, medford said:

gotta leave at least 1 around to dig footers.  I imagine footer digging isn't too far behind at this point.

Some of those footers/piers are 30'+ deep. They're drilling those, not digging. There will be a new group of equipment come in for the footers. 

  • Like 2
Link to post
Share on other sites
3 minutes ago, beastfan11 said:

Just popping in to remind everyone it’s “footings” and not “footers.” Cheers.

always that guy who feels to need to correct every little detail. i for one cant wait to see the footers being poured :)

  • Like 5
  • Thanks 1
Link to post
Share on other sites
  • malem locked this topic
Guest
This topic is now closed to further replies.
  • Recently Browsing   0 members

    No registered users viewing this page.




×
×
  • Create New...