-
Posts
4,251 -
Joined
-
Last visited
-
Days Won
87
Content Type
Profiles
Forums
Events
Posts posted by Maverick44
-
-
Honestly in my view the batwing looks like its completely gone. idk.
-
1
-
-
I see they started again removing metal near the approach to the batwing.
-
1
-
-
Big Yellow taking next helix track section up and over! Its a huge piece!
-
2
-
-
It may just be my screen but I can't see the approach to The Bat wing. Looks like a gap there but maybe its a tree.
-
2
-
-
The batwing is half gone. The approach to the batwing also gone.
Can't really see but no other movement at this time.
There has been a few trucks pulled up to DB. Work being done still?
-
2
-
-
Wow we are going to be able to see the demise of Vortex live on camera. This is crazy!
-
2
-
-
I knew they brought in Big Yellow to lift track up and over the already installed track fort he helix. I hope we see the helix finished today!
-
1
-
-
15 hours ago, Kodistict said:
Yeah, I was thinking the same thing. Also, what does BY stand for? Big Yellow? If so that would be a hilarious name for a crane
.
Yeah thats it lol
-
I think Sky flyer would be cool over in Area 72. It can act as " training" for the test pilots. IDK where but if the do expand. We know CF is willing to move the sky coasters within the same parks Ala CP.
-
1
-
-
2 minutes ago, Kodistict said:
Looks like Cleo has moved a little bit.
I was thinking that Cleo was just moved out of the way to get big yellow in place. I think BY can lift the track section higher over top of track already installed. Cleo is there to help. T-Bone is just getting a head start on post head chopper supports.
-
1
-
-
16 minutes ago, Maddog said:
I'm really surprised those maintenance worker posts are getting traction here on KIC. This site is usually strict with photos.
Can't imagine the park is too happy with someone posting current pictures from inside the park when it is closed. From what I read on Reddit, these were pictures someone obtained from their family member (uncle, who was contracted for work, not KI employee). So the actual photographer didn't post these. This didn't come through official channels.
I can understand the first photo where all you see is down the hill of DB. The new photo yeah I can see where KI would not like thst getting out. They seem to want to keep Vortex hidden.
-
2
-
-
I think they are using bigger crane to lift track sections over the helix . The other two might not of been able.
Also they can drive those cranes with the booms / arms up like that. I don't think anything is wrong. Just don't need Cleo right now.
Big crane seems to be raising.
-
1
-
-
You are probably right. I wonder why they have stopped working on the helix.
-
5 minutes ago, LovinMeSomeBanshee said:
I was thinking that was more of the helix track being assembled, but it's hard to tell.
I thought that as well. Then I saw the backside of it looks like something round. lol there is some sort of machine on the ground right by it moving so idk lol Its just weird looking.
-
-
Yeah there is a 3rd crane on site now. We all know lol. Thanks for the 10 posts about it lol j/k
EDIT - First time in a while no track is gone up during the day.
-
2
-
-
11 minutes ago, DeltaFlyer said:
Part of what you are seeing is the oxidation on the exposed steel part of the rails. Without the train wheels keeping that oxidation from forming, that orange rust color really starts to show through. It's just like how brake rotors get a thin layer of rust on them when it rains.
I was mainly talking about how faded it is. Also the rust looking color as well. i just know its never been repainted and should get a coat asap lol
-
3
-
-
These pictures from on DB really make the coaster look like its in poor shape lol. The paint needs done SOOOOOOO bad lol
-
6
-
-
Action Zone feels so out dated. I would like to also see a re theme into a dark forest or some type of haunted area. Theme things like Banshee and make gothic era-esk.
-
7
-
-
Can't wait to see the helix finished. It will be close today.
-
4
-
-
Maybe they are taking a semi early lunch?
-
1
-
-
T bone went all the way over to the other side of the lift hill.
-
1
-
-
T bone has now lowered his boom. Cleo moved closer to maybe get that section of track.
5 minutes ago, KIguy2004 said:What I meant is like they would have to run the wire/ride systems/hydraulics through every part of the station.
The trains are not on the track right now. All that will be in place and working by the time trains are ready to go on the track.
-
1
-
-
2 minutes ago, KIguy2004 said:
How do they put the trains on the tracks when there is no electric to run the transfer table?
If its like Diamondback... I am sure it is. All they do is lift the train into the storage shed track and push them by hand to connect each car together. I am sure there is electric by now as well. It is run underground so it has been there for awhile. I also remember reading in a blog or something that the operating system is nearly all in place.
@Waltny is there anyway whenever you drive past again to zoom in to the lift hill. Can we see if the chain is already in place?
-
4
-

Vortex Removal Updates
in Kings Island
Posted
I go back and forth with it. One moment it looks gone and the next I see it. I think you are right. I see it at the moment lol