Jump to content

gforce1994

Members
  • Posts

    2,106
  • Joined

  • Last visited

  • Days Won

    4

Everything posted by gforce1994

  1. I got a Wing Coaster of 4900 feet and a launch coaster of 4300 feet using that land.
  2. How is that website non-credible? If you remember the markers by The Bat, it was on this website. Everything posted on the site you mentioned has been thoroughly double checked. Furthermore, this topic was created by @IndyGuy4KI.
  3. The thing is, should KI pursue building a front gate coaster (only park in top 5 CF properties without one), they would need to come up alongside the road that already exists (no need to build over office buildings) In fact, using the old SOB station allows a great opportunity for a coaster along the front entrance and a weenie for Action Zone. One could easily put a ride similar to Helix at the front (would work well with the trees).
  4. But then again, the only Arrow Suspended coasters to close did so for these reasons: car failure (rare case), engineering oversights (BBW and Bat), park closing, and maintenance becoming too expensive.
  5. True, however, the oldest steel coaster in the park is Adventures Express. CP’s oldest steel coaster is 22 years older.
  6. We have seen markers on the road, as well as markers at the SOB station. With the situation for which Orion was created, it’s possible for a new addition.
  7. They can connect the two sites without removing The Bat.
  8. Well, you’re not going to to be leaving a 140 foot tall steel coaster standing without maintenance are you? It doesn’t matter if they have plans or not, it needed to come down.
  9. My interest rose with the markers along Columbia Road. These two events occurring simultaneously is an interesting development.
  10. Put a new station there and connect the markers- you could get a coaster with a dogleg layout.
  11. With the station coming out, the question is, what fits that spot and the location of the markers?
  12. The thing is that people do notice. When I was taking pictures of the station, people kept on mentioning how that used to be the station for SOB.
  13. Well those wires have been cut. They’re not being replaced.
  14. The cutting of electrical wiring would make sense as a preliminary step towards taking down that structure.
  15. It looks like they’re removing the electrical systems.
  16. Lights on at SOB queue and station.
  17. I wouldn’t say that. I think they are creating a patio. It gets quite congested on the walkway between Vortex and Backlot.
  18. They’ve removed the straw from in front of the fence.
  19. I wouldn’t say so. They’re kind of like the rough draft of research reports. They can change at a moments notice depending on the data being returned from the experiment. This pandemic will have a greater impact on future years 2024 onwards, rather than 2022 because of the contracts that have been made and signed.
  20. The question is, with 5-year plans allowing wiggle room (flat ride becomes coaster that couldn’t be built at original park), could a coaster planned in the original 5 year plan still be built?
  21. How do you know something wasn’t already paid for? Currently we have over 40 markers, in a 5 acre plot of land.
  22. That would be correct, i made the same deduction. The fact surveyors have been observed conducting a survey of the elevation of the land is rather interesting, IMO.
×
×
  • Create New...