-
Posts
2,115 -
Joined
-
Last visited
-
Days Won
4
Content Type
Profiles
Forums
Calendar
Everything posted by gforce1994
-
KI Blog: The Beast gets its name 40 years ago today
gforce1994 replied to BoddaH1994's topic in Kings Island
Here you go. This is the original train as designed. My guess to why they didn’t do this was a). Guests would pick at it, and b). the decorations would created aerodynamic disruptions that would cause a greater friction loss, which would prove problematic on colder days. -
KI Blog: The Beast gets its name 40 years ago today
gforce1994 replied to BoddaH1994's topic in Kings Island
Instead of the claw decal on the front, I want them to bring back the lamp that was originally attached to the trains. That would be ideal for me. Regardless, I’m loving the paint scheme (I always tried to replicate it in RCT). -
KI Blog: The Beast gets its name 40 years ago today
gforce1994 replied to BoddaH1994's topic in Kings Island
I’m loving the change. However, I’m mystified why they used “Beast” and “Unleashed” in the same sentence in the tweet, considering how outrageous the enthusiasts’ rumor mill becomes. -
Your nightmare has arrived:
-
The Groundhog has spoken, no Giga for 2019.
-
Cedar Fair working with Bitec for parts
gforce1994 replied to IndyGuy4KI's topic in Other Amusement Parks & Industry News
Here’s the rundown, yes it’s great that someone reverse-engineered the parts, but it’s a catch 22 situation. With the reverse-engineered parts you can get the parts at a cheaper rate, however, if they don’t know any company protocols used for the production of said parts, you’re going to have to replace them more frequently than the authentic parts needed replacement. If that’s the case, then you’d likely be paying the same amount for both cases. If this sounds ludicrous, here’s my point. While many of the ride companies make money off of selling new rides, a portion of their profit comes from selling replacement parts. Is a company really going to be giving the manufacturing procedure to a potential rival? It’s an interesting solution to a common problem. I wish both companies the best of luck. -
Huh?
-
Future plans for Firehawk's station discussion
gforce1994 replied to Codyfryguy's topic in Kings Island
And the station is gone according to reports. -
I wonder if they’re bringing in RMC for the pavers or entryway walkways.
-
Quick Q: what if it’s a commercial flight? Just asking.
-
I wouldn’t even attempt it, as I don’t have a pilot’s license. Joking aside, I would never do it.
-
Only parks with FAA restrictions are the two resorts starting with the letter D ( NOT DORNEY).
-
Yep. Having done a lot of work and play with rockets, I know what you mean. That last line is hilarious nonetheless.
-
You could if you messed with the fuse. But there would be so many insurance issues that would nix that.
-
Firehawk Leaving Kings Island 10/28/18
gforce1994 replied to IndyGuy4KI's topic in Kings Island Central Newsroom
Actually, I’ve heard from numerous people that there were inquiries into making SOB an RMC. The structure of the ride was so poorly designed, that from an engineering standpoint, it would be practical to raze the ride and build an RMC from scratch, which means that instead of looking at a SOB renovation, you’re looking at a replacement project. -
Firehawk Leaving Kings Island 10/28/18
gforce1994 replied to IndyGuy4KI's topic in Kings Island Central Newsroom
-
Firehawk Leaving Kings Island 10/28/18
gforce1994 replied to IndyGuy4KI's topic in Kings Island Central Newsroom
The NL2 recreation has been updated. Here's what the site looks like according to the O'rourke Wrecking Company video. -
To be fair, these claws would be nice as well!
-
-
Kings Island is taking no chances with webcams. They took down the secondary webcams that showed International Street. The last time it was active was 19 days ago.
-
Firehawk Leaving Kings Island 10/28/18
gforce1994 replied to IndyGuy4KI's topic in Kings Island Central Newsroom
-
Firehawk Leaving Kings Island 10/28/18
gforce1994 replied to IndyGuy4KI's topic in Kings Island Central Newsroom
Here’s a mock up of the demolition. They’ve started taking out the pre-drop portion before the first lie-to-fly inversion.