Jump to content

fyrfyter

Members
  • Posts

    1,571
  • Joined

  • Last visited

  • Days Won

    1

Everything posted by fyrfyter

  1. Looking back on everything, I suspect this message came from above KIs control. I suspect they were told to lose the coaster that costs money but was lacking in attendance and sadly that’s the oldest one we have that fit that profile. I hope we don’t get the SBNO treatment on it. That would hurt more than just being gone.
  2. I noticed that as well. The part they rebuilt has really helped and it was quick yesterday.
  3. I would agree with TG/TB just being long due to its random setback at a far location. Got my last ride in on Vortex today. It’s getting harder on me as I get older. I’m still going to miss it though. It just won’t feel like KI without it, unless by chance we get Vortexed, then it might be ok...
  4. Their real name is bowstring trusses. It’s a specific design that’s applied to arches.
  5. Per the ILN weather balloon launch today and recorded sounding, it’s definitely windy with altitude. Wind barbs show direction and speed. Full lines equal 10 knots, half lines are 5, and triangles are 50. Current conditions and forecasts from local airports actually have winds decreasing during the day today.
  6. I don’t think we will see anymore brake run anytime soon. That would put stuff directly in the paths they are using to drop off additional crane parts. Unless they do work further down the circuit, I think the only thing we see going forward for a while is the hill and the drop.
  7. There’s a semi dropping off more crane sections as we speak. Is this a building style crane? It sure looks like it with the box style support structures.
  8. I like the look of this thing. You can see where the water at the end is multifunctional. Yes, it sprays, but it also does a great job of introducing enough drag to slow the coaster car down. Less wear and tear on mechanical parts and things like brakes. Knowing how water works in regards to pumps, it probably uses way less pressure than most think to actually get the car moving.
  9. No thanks. You don’t put crappy topper track on something as classic as The Beast. It wasn’t that long ago where we watched as they rebuilt sections of it during the off season. I have zero concerns and am not interested in topper track for any of our coasters. It will change the experience as a whole, and not in a good way.
  10. Is that anything like the field of screams?
  11. I suspect the crane that is theirs will be leaving when their work is complete. Granted, that will likely conclude with the finishing of the station and transfer/maintenance areas.
  12. Yes. I was having delay issues and couldn’t see what you were seeing.
  13. I don’t see it. It looks like they are currently setting pieces for the station in place.
  14. That’s another great picture and explanation. When someone asked this, the first thought that came to mind was TG/FD/TB transfer track and how it works. I did know that to be the original station and the cutouts above the barn doors where The Bat track came through.
  15. I’ll save you some time in the future... https://www.suncalc.org/#/39.1366,-84.5406,10/2019.10.08/11:20/1/3
  16. That was definitely a shadow. They rotated the crane and there is nothing there.
  17. That could be correct as well. The picture shows that the backbone slants slightly as to its overall height.
  18. The question that just came to mind is how many of those can they safely set, without the legs up? This may be one of those days where we see 2 cranes in operation at once. One to hold the legs after they are in place and then set the remaining pieces of the backbone in.
  19. I agree. I suspect your part in red is in 2 pieces though. It would be darn tough to move it as 1 continuous piece that has to line up correctly in 2 different places on 2 different planes.
  20. That would make sense. If they built several of those pieces together and then tied them into the valley they have installed, it would be vertical, but also have the linear strength of the other pieces of track. Help hold the backbone while they build the drop.
  21. I think they’ll renovate another restroom as well... tis cheap...
  22. The queue is shorter. There used to be more railing headed back towards the diner. They removed a lot of it when KMAA was installed. Those station pics are interesting- there was no bridge over the track when that station was originally built.
  23. The article says it will be up by the first week of November. There’s probably a weeks worth of work just to put the crane together.
  24. That shouldn’t really be a surprise, with our extra month of “summer”
  25. Stagnant pool for mosquitoes... no thanks. I think they would also have to completely change and redo the queue. I think part of it now sits where water used to be.
×
×
  • Create New...