Jump to content

Mystery Construction at Cedar Point


Recommended Posts

Has anyone heard how extensive the "retracking" actually was? I believe it was said that this is just annual maintenance here. If this is the case, I would say to not expect much after the first month or so of running the ride.

GCII is not normally contracted to do annual maintenance by a park the size of Cedar Point.

And yes, someone knows how extensive it was.

Terpy, just sayin'

Link to comment
Share on other sites

  • Replies 75
  • Created
  • Last Reply

Top Posters In This Topic

Good thought Captain.

I see some new wood...not as much as I hoped but.

Download the original size and enlarge it a few times. Look at the layers of track around the bottom of the first drop. It looks like several of those layers were retracked, including the bottom of the first drop. Maybe, just maybe it'll be fast again.

Link to comment
Share on other sites

I have an Idea. If KI were ever too desperate for land and wanted to expand couldn't they get rid of part of the parking lot over by Top Gun? I know people are gonna say then parking would be an issue. So why not turn part of the remaining parking lot into a parking structure. Something sort of like this?

Untitled-1.jpg

Link to comment
Share on other sites

Well KI has plenty of land before they would need to consider an option like that.

Not to mention the cost of parking structures is insane and I dont think anyone would be bidding to be the first to park in the garage.

^ that's the truth...average cost to build a multi-level parking structure is $10-13K per parking space!

I've always been really impressed with how Universal manages parking operations in their garages...whether you're coming in during peak entrance times or leaving at closing, they keep traffic moving and the process is very smooth. (The parking garage I park in every day could learn a few lessons from them :) )

Link to comment
Share on other sites

So I got curious, I wondered if some of the rides being rumored could actually fit in there, so I photoshoped Roar at Six Flags America and Hydra the Revenge at Dorney Park into the area. I tried to find a Gravity Group ride, but none of them were good examples, or rides I could get on MVE

Mind you, all of the photoshops were done with Microsoft Virtual Earth from "Birds Eye View", and they were all at 50 Yards out, and I did not re-size them to fit, all I did was rotate them:

Here is Roar, the GCII, in the said area:

CedarPointGCIIcopy.jpg

Here is Hydra, the B&M, in the said area:

CedarPointBM.jpg

So I think that most of the said rides could easily fit in there, and that they probably wouldn't have to remove anything.

Link to comment
Share on other sites

  • 3 months later...
Guest rcfreak339
Little orange flags of fun have been spotted near Cedar Creek Mine Ride.

db_2009_0623_Flags11.jpg

db_2009_0623_Flags21.jpg

What a shame I didn't get to ride it this year.

Who stated they will be taking it out? No one! Don't jump to conclusions to fast Jackson!

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

 Share

  • Recently Browsing   0 members

    • No registered users viewing this page.



×
×
  • Create New...