August 22, 20224 yr As we announced on the last episode of The Attractions Group Podcast, Jeff Pike - the roller coaster engineer behind such rides as Mystic Timbers, and owner of Skyline Attractions - will be our next guest. We already have a few dozen questions for him but I thought I’d open this up to any of you to see if you have any questions that need to be addressed. Thanks in advance!
August 22, 20224 yr Author 11 minutes ago, ThrillKingsFitzy said: How soon will they incorporate more extreme layouts into their Titan track? I put that in. Not those exact words, but it’s in. Thank you!
August 22, 20224 yr Could we see Skyline/GCI look into similar, long lasting, track styles like Gravity Groups engineered pre-cut track, besides the Titan Track? Or is it something you’d incorporate by default into your normal wooden track?
August 22, 20224 yr When designing a ride with Titan Track such as Zambezi Zinger, What factors determine where normal wooden track and titan track is placed?
Create an account or sign in to comment