fryoj
Members-
Posts
1,456 -
Joined
-
Days Won
9
fryoj last won the day on July 19 2019
fryoj had the most liked content!
Recent Profile Visitors
4,207 profile views
fryoj's Achievements
KIC Star Member (7/13)
4.2k
Reputation
-
It's just a big chat room at this point.
-
If thats the case, and it's the big red barn, you might be able to see it from over at KMAA or right next to the old arcade.
-
Try messaging them rather than posting in here maybe?
-
If I would have said that, I'd have been insulted and told to let people have their fantasies. Like others have said, that's just a baby crane. Thats the one to unload track off trucks and build the real cranes.
-
At start it does, but it has a pretty good downslope to it like Leviathan.
-
Here's the post below. He didn't post it on the page, but he did message it to me and others and was correct.
-
MT's name got leaked at the last minute, so it wouldn't be surprising.
-
I wonder if the big box is still up there with a lock on it like yesterdays box?
-
Canada's Wonderland 2020
fryoj replied to Rivertown Rider's topic in Other Amusement Parks & Industry News
25 ft is a lot higher when you are standing on top looking to jump. I did a similar jump at Blue Hole in Jamaica and it gets your heart pounding. Not too many people would jump from higher than that I don't think. That being said, I am surprised they are adding this. It's only a matter of time till someone who thinks they are a bad a.. tries some stupid flip and lands on his neck. I love that they added it and would like one at KI, I just don't know if it'll work in a theme park environment. -
2014 got to 459. Of course that one had the joy of people looking at footers that were clearly for a B&M Inverted insisting they were for an Intamin Giga. That had to be worth an extra 60 pages of denial.
-
I honestly think that after this ride has been built we will still have people on here saying "but what if the blueprints are fake"
-
If they are guest removable, theres probably a note and/or prize in them.
-
I'd bet against track being installed friday. Even if they get it to the site Friday, they still have to get cranes on site and assembled. Maybe next week they will start, but it may be longer than that. In the video with Chad, it said it looked like someone tried to put it through a shredder.
-
They didn't start vertical construction until the end of September though. This should start a month earlier than that, so an early November topping off is possible. Possibly even before the end of haunt.