SonofBaconator Posted June 13, 2019 Share Posted June 13, 2019 Quote Link to comment Share on other sites More sharing options...
KI FANATIC 37 Posted June 13, 2019 Share Posted June 13, 2019 Oh wow! Did this just happen? Or is it an older post? Quote Link to comment Share on other sites More sharing options...
SonofBaconator Posted June 13, 2019 Author Share Posted June 13, 2019 2 minutes ago, KI FANATIC 37 said: Oh wow! Did this just happen? Or is it an older post? Just happened! 1 Quote Link to comment Share on other sites More sharing options...
malem Posted June 13, 2019 Share Posted June 13, 2019 GateKeeper is one of the first coasters to shut down for high winds, but sudden gusts are hard to predict on the lake. Hopefully there were no nervous riders on board. Maintenance will have a long night. 1 Quote Link to comment Share on other sites More sharing options...
BoddaH1994 Posted June 13, 2019 Share Posted June 13, 2019 Last time this happened (that I know of) was during initial testing before it opened. They needed to take the train apart with a crane. Let’s hope that’s not the case here. 1 Quote Link to comment Share on other sites More sharing options...
malem Posted June 13, 2019 Share Posted June 13, 2019 When Millennium Force valleyed without riders a few years back, the train was disassembled to get it back to the station. The big challenge here will be the massive size of GateKeeper's trains. Taking the train apart might be easier than winching it all the way from the turnaround. Quote Link to comment Share on other sites More sharing options...
SonofBaconator Posted June 13, 2019 Author Share Posted June 13, 2019 26 minutes ago, malem said: Taking the train apart might be easier than winching it all the way from the turnaround. At least it valleyed at the lowest part Quote Link to comment Share on other sites More sharing options...
diamondbackfanatic Posted June 13, 2019 Share Posted June 13, 2019 Park spokesperson Tony Clark released the following statement to WKYC Thursday morning: “At approximately 9:30 p.m. last night, a train on the GateKeeper roller coaster did not complete its full circuit due to weather conditions at the time. The train came to a stop on a section of track near the main entrance. The ride’s safety systems engaged as designed and an additional train was stopped on the lift hill. Guests in both trains were escorted safely from the ride.” here is a link to one of the articles. it's very short and to the point. https://www.wkyc.com/article/entertainment/places/cedar-point/video-shows-cedar-points-GateKeeper-roller-coaster-getting-stuck-mid-ride/95-9d116e98-8112-491b-9212-855e47f11adb Quote Link to comment Share on other sites More sharing options...
Cedar Fair Fanboy Posted June 14, 2019 Share Posted June 14, 2019 Calling Cedar Point. Put heavy train in GateKeeper next time. Quote Link to comment Share on other sites More sharing options...
FoF96" Posted June 14, 2019 Share Posted June 14, 2019 I wonder if it ever opened today, I looked online at wait times and it said it was closed but that didn’t necessarily mean anything because Dragster was also closed. Quote Link to comment Share on other sites More sharing options...
malem Posted June 14, 2019 Share Posted June 14, 2019 It didn't operate today. In fact, the train on the lift is still there at last report. Considering today's inclement weather, sending that one might have left them with another train to remove via crane. They did get the valleyed train off the course. (Photo credit: Brett) 3 Quote Link to comment Share on other sites More sharing options...
KI FANATIC 37 Posted June 14, 2019 Share Posted June 14, 2019 That is crazy they have to do that! Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.