-
Posts
1,049 -
Joined
-
Last visited
Content Type
Profiles
Forums
Calendar
Everything posted by Gplez90
-
Id say we can expect it to go on the track maybe later next week. I don't believe the station has to be completely built for them to begin testing; just the electrical components need to be in place.
-
How bout that Banshee guys......... (My horrible attempt to get back on topic) Sent from my iPhone using Tapatalk
-
If you look closely, there is exposed dirt (from the snow) that appears to be in the same pattern as the orange sheets are laid in. Thats pretty strange. EDIT: So it appears that those orange tarps may have something to with the fact that they have grouted the bottom of the supports in that part of the ride. You can also see that they have covered the bottom of the supports with bags to help the process.
-
I think it looks good too. Itll look even better when they attatch the rest of the body to the cars, and not to mention when the other two different color trains arrive. Sent from my iPhone using Tapatalk
-
When in the season did you ride Gatekeeper? It was mid June. I've heard they've made improvements, but I'm curious how well they did. the actually did a great job. The vest doesnt lock at all. Also, depending on where you sit, it actually enhances the ride experience a little bit especially in the front right on the wing over drop and the immleman. Hopefully Banshee will be some of the same. Sent from my iPhone using Tapatalk
-
From what i remember, they said they will the same thing with Banshee's restraints as they did with Gatekeeper's later in the season. I dont think there will be any bruised collar bones on this media day! Sent from my iPhone using Tapatalk
-
THE TRAINS!! THEYRE HERE!!!! Sent from my iPhone using Tapatalk
-
Im all for it!^^ Sent from my iPhone using Tapatalk
-
I was looking back at some of my post and saw that i had posted "26 track pieces to go" on Jan 13th. It took them a mere 10 days to install 26 track pieces! Thats just over 1/4 of the entire ride in 10 days!!! Again, i can't congratulate these guys enough for their hard work and dedication!
-
^^ Id lose my mind! Im think a Banshee scream either every 30 mins or every hour on the hour. Sent from my iPad using Tapatalk
-
I think thats what theyre shooting for! Judging by the renderings and the latest photos of station construction id say theyre spot on! Sent from my iPhone using Tapatalk
-
I think the Gothic Moon music from RCT3 would suit Banshee just fine Sent from my iPhone using Tapatalk
-
How about wherever the put the camera, the use the tall celtic tombstone to support it instead of a steel support. Sent from my iPhone using Tapatalk
-
It still amazes me how large those sections of track are. Look how small that man looks right next to that piece of track. I could really go on all day about the appreciation i have for the size of this coaster lol. P.S. i know that the sections of track on the lift hill are larger than the rest of the ride, but still.
-
R.I.P. CJ You lived a great life buddy! We'll miss you! Sent from my iPad using Tapatalk
-
Sorry to get back on topic here, but it looks as if they have done a significant amount of site work, specifically around the area where the entrance of the ride will be. Theres a crane working on the bottom of the lift hill, my guess would be that it is putting the lift chain motor in place. Again, sorry to get back on topic. Sent from my iPad using Tapatalk
-
What about the water bomb on Maverick and the splashdown on Diamondback?^^ Sent from my iPad using Tapatalk
-
What ride are you going to ride first in 2014?
Gplez90 replied to TheBeast1116's topic in Kings Island
After media day, The Beast. Sent from my iPad using Tapatalk -
Lets play "How many rides can you spot in the photo above?" Sent from my iPhone using Tapatalk
-
Touché^^ Sent from my iPhone using Tapatalk
-
I hope they place the camera at the exit of the dive loop Sent from my iPhone using Tapatalk
-
From the midway, yes, but the queue (referring to the blueprints) will be situated between the station, lift hill, and the zero-g roll. Sent from my iPhone using Tapatalk
-
I dont find long lines as bad if its a ride where you can watchin the coaster go through a lot of its cycle. Judging by the location of Banshee queue area i think we may get to see Banshee go through its entire cycle while standing in line. Sent from my iPhone using Tapatalk
-
I couldn't wait that long!!! It's hard enough waiting just until April 17th! wont there be 1000 schools their on senior trips, music trips, physics trips and other school trips though? I always find that the most annoying time to go. Line jumping, barely clothed young teens, and not to mention getting caught in line with young teens having very loud and inappropriate conversations. Sent from my iPhone using Tapatalk
-
Peak: 3 1/2 hours (maybe not in opening day but opening weekend for sure) Sent from my iPad using Tapatalk