I think if they were going to CGI The Beast they would have done that instead of building Timbers. If the out cry was to get to the point that a majority of people called for it they would. Switching trains to to the CGI trains would be a plus but not sure if they could make them as long as the PTC trains. The Beast is different because of its leangth and I'm not sure if KI would want to sacrifice the rides per hour. I'm sure it could be done but I'm no engineer. Sent from my SM-G900V using Tapatalk