Aaron Posted October 13, 2008 Share Posted October 13, 2008 So i have never rode a coaster with a splashdown do people on the coaster get wet or just the people watching. You get a small amount of mist if you sit on the outside of the last row where the scoops for the splashdown effect are located. Link to comment Share on other sites More sharing options...
Admiral Ackbar Posted October 13, 2008 Share Posted October 13, 2008 This ride looks spectacular! Can't wait to ride it! Link to comment Share on other sites More sharing options...
Beast1979 Posted October 13, 2008 Share Posted October 13, 2008 Most of all I'm shocked by the size of the size of the hill after the splash down. This is going to be great! Yea, the last drop into the splashdown is a little over 100 feet tall. While it is pretty impressive sounding, from an engineering and design standpoint, it just shows how much more B&M could have done w/ the design of Diamondback. Don't get me wrong, I am extremely excited about Diamondback, but w/ the site's topography, B&M could have designed something truly spectacular and unique - not just a Behemoth/Nitro lovechild. There are 6 drops over 100 feet. That means the drop out of the MCBs is the last 100 foot drop. From looking at the concept art and the size of the drop relative to other Rivertown objects it looks like about 50 feet into the splashdown. It's actually pretty hard to work the coaster into the topography, most of the terrain out there is very dramatic and difficult to work with, they actually had to smooth out the ravine to get it to work. (Which, by the way, allows the second drop to be 193 feet, and the 6th drop to be over 100 feet) And I am kinda getting tired of people calling this a Behemoth/Nitro lovechild or ripoff. Not only has it not even opened yet, but it also has 6 drops over 100 feet and 2 drops near or over 200 feet, a splashdown, and it actually has a THEME. Not to mention the location of this ride is excelently placed, the first drop catapulting towards the Crypt's que and a helix over the pathway, not like Nitro where they just ploped it in a forest. Link to comment Share on other sites More sharing options...
ZosoBeast Posted October 13, 2008 Share Posted October 13, 2008 From the Diamondback Blog: Did you know? October 11, 2008 Construction of Diamondback began one year ago today when workmen removed a tree on the far side of Swan Lake near the International Showplace Theater. - Don Helbig Was it one of the three Christmas trees sitting on that raft? Link to comment Share on other sites More sharing options...
Beast1979 Posted October 13, 2008 Share Posted October 13, 2008 Clifford is picking up big supports! Link to comment Share on other sites More sharing options...
KIlover123 Posted October 13, 2008 Share Posted October 13, 2008 And I am kinda getting tired of people calling this a Behemoth/Nitro lovechild or ripoff. Not only has it not even opened yet, but it also has 6 drops over 100 feet and 2 drops near or over 200 feet, a splashdown, and it actually has a THEME. Not to mention the location of this ride is excelently placed, the first drop catapulting towards the Crypt's que and a helix over the pathway, not like Nitro where they just ploped it in a forest. Exatly they did just slaped Nitro in a forest. Link to comment Share on other sites More sharing options...
RailRider Posted October 13, 2008 Share Posted October 13, 2008 Wow, where do I start on this theread. I go in the basement for a weekend and all heck breaks loose. Diamondback and its design could land it as one of the best B&M Megas around if not the best. Also could ticket it to the top of a list that awards awards. Like they say can't please everyone all the time. Side note the new DB Blog for today mentions that by the end of the week the lift hill will stand around 200 feet. That is exciting Link to comment Share on other sites More sharing options...
BoddaH1994 Posted October 13, 2008 Author Share Posted October 13, 2008 Parks closed so they are working away at it once again! Word from under the Black Hat is that the much of the lift hill will be finished by Friday! photos courtesy of Don Helbig More in the KICentral Photo Gallery Link to comment Share on other sites More sharing options...
firehawkboy Posted October 13, 2008 Share Posted October 13, 2008 Yeah, I heard that the lift will be done by the end of October, but I like the word from the "black hat" better. :D Link to comment Share on other sites More sharing options...
Beast1979 Posted October 13, 2008 Share Posted October 13, 2008 It's not under the "Black Hat" anymore! Workmen at Kings Island will be installing a significant amount of track on Diamondback’s 230-foot lift hill this week. The lift hill will stand close to 200 feet by the time the gates open Friday at 7:00pm for Halloween Haunt. - Don Helbig I can't wait to see how this shapes up! Link to comment Share on other sites More sharing options...
BoddaH1994 Posted October 13, 2008 Author Share Posted October 13, 2008 More photos courtesy of Don Helbig More in the KICentral photo gallery! Link to comment Share on other sites More sharing options...
Coasterfreak93 Posted October 13, 2008 Share Posted October 13, 2008 hi this is my first time posting on KICentral. i have read posts on this site since i found it in late 2006 (Firehawk construction) i'm just wondering does the bottom of the first drop not look lower than 15 ft off the ground Link to comment Share on other sites More sharing options...
RailRider Posted October 13, 2008 Share Posted October 13, 2008 Love the lifthill goodness. This thing is going to make a lot of Nickles for the park. Link to comment Share on other sites More sharing options...
DropZone99 Posted October 13, 2008 Share Posted October 13, 2008 Clifford is picking up big supports! Do you not go to school that often? Or does your school just start super late? The post i just quoted and many of your other posts are posted on weekdays around 9am-1pm. Or do you just post at school? Sorry to get off topic.. Link to comment Share on other sites More sharing options...
Beast1979 Posted October 13, 2008 Share Posted October 13, 2008 That Next Support is HUGE! I think they're gonna install the next piece of lift track tomorrow. Link to comment Share on other sites More sharing options...
RailRider Posted October 13, 2008 Share Posted October 13, 2008 hi this is my first time posting on KICentral. i have read posts on this site since i found it in late 2006 (Firehawk construction) i'm just wondering does the bottom of the first drop not look lower than 15 ft off the ground Welcome, glad you decided to make your first post. There should roughly be 15ft of clearance at the bottom of the first drop. Afterall we are talking the rails are 15ft above the ground, not the box spine which drops a few feet bellow the track. Link to comment Share on other sites More sharing options...
FOFreak Posted October 13, 2008 Share Posted October 13, 2008 The measurements are 99.9% correct all of the time. It takes many many months of persice planning to design a roller coaster. Welcome Coasterfreak! Link to comment Share on other sites More sharing options...
skaterboy22101 Posted October 13, 2008 Share Posted October 13, 2008 Clifford is picking up big supports! Do you not go to school that often? Or does your school just start super late? The post i just quoted and many of your other posts are posted on weekdays around 9am-1pm. Or do you just post at school? Sorry to get off topic.. hahahaha we have talked bout this before. he gets on the school computers during studyhall and connections Link to comment Share on other sites More sharing options...
Coasterfreak93 Posted October 13, 2008 Share Posted October 13, 2008 alright i get it i'm going to ki this saturday and can't wait to see the lift hill Link to comment Share on other sites More sharing options...
FOFreak Posted October 13, 2008 Share Posted October 13, 2008 [towlie voice]Don't forget to bring a camera...[/towlie voice] Link to comment Share on other sites More sharing options...
Coasterfreak93 Posted October 13, 2008 Share Posted October 13, 2008 i have a camera on my phone i think Diamondback will be a great addition to ki now if they could get a couple of flats for 2010 and make X base an official section Link to comment Share on other sites More sharing options...
RailRider Posted October 13, 2008 Share Posted October 13, 2008 Clifford is picking up big supports! Do you not go to school that often? Or does your school just start super late? The post i just quoted and many of your other posts are posted on weekdays around 9am-1pm. Or do you just post at school? Sorry to get off topic.. Beast1979, didn't your mom block KIC on the home computer? Link to comment Share on other sites More sharing options...
FOFreak Posted October 13, 2008 Share Posted October 13, 2008 ^^Exactly!!! X-Base should so definatly be a section! But Flight of Fear will still dominate the section. Bring back the Eagles!!! ^LOL, that was me. I'm stuck using my IPod Touch. Link to comment Share on other sites More sharing options...
Beast1979 Posted October 13, 2008 Share Posted October 13, 2008 Clifford is picking up big supports! Do you not go to school that often? Or does your school just start super late? The post i just quoted and many of your other posts are posted on weekdays around 9am-1pm. Or do you just post at school? Sorry to get off topic.. Beast1979, didn't your mom block KIC on the home computer? No worries, I've resolved the situation... Link to comment Share on other sites More sharing options...
Coasterfreak93 Posted October 13, 2008 Share Posted October 13, 2008 what they should do is get s and s swing like skyhawk put it in the space between racer and fof then get a jump 2 ride and place it past Firehawk Link to comment Share on other sites More sharing options...
FOFreak Posted October 13, 2008 Share Posted October 13, 2008 ^^Proxys? (i.e.: wowigotin.com, circusfox.com) Link to comment Share on other sites More sharing options...
Coasterfreak93 Posted October 13, 2008 Share Posted October 13, 2008 any way Diamondback's lift is steep like millineum force i hope it's a slow ride to the top Link to comment Share on other sites More sharing options...
RailRider Posted October 13, 2008 Share Posted October 13, 2008 Well dont look for anything real soon, seeing as DB is a huge investment. So look for some cooling off before KI gets anything major again for a few years after DB Link to comment Share on other sites More sharing options...
skaterboy22101 Posted October 13, 2008 Share Posted October 13, 2008 even better. take out Firehawk(sorry guys i dont like it) and bring down volcano the blast ride and add a restraunt and some bumper cars(big bopy bumper cars that go really fast) Link to comment Share on other sites More sharing options...
RailRider Posted October 13, 2008 Share Posted October 13, 2008 Time to get back on topic kids Link to comment Share on other sites More sharing options...
Recommended Posts