Jump to content

Intresting CP Tweet


Recommended Posts

It really needs to be a new coaster. I said before they haven't had one since 2007. If next year they don't have one, then that's three years. And for a big, really popular park like that, it'll bring down the visitors. They need something new and interesting. I know Cedar Point has tons of guests but having no new rides is bad. (or no new GOOD rides).

Link to comment
Share on other sites

Not to mention that Six Flags Magic Mountain is getting a new roller coaster for 2010. That would tie them with Cedar Point for the most roller coasters, taking away their "Most roller coasters in the World" record.

Before you say the public doesn't care, uh, Cedar Fair does. We all know how much they love records, especially a record like that for their flagship park, I don't see them not doing anything about it.

Link to comment
Share on other sites

via Facebook: "Cedar Point is not building an S&S, a B&M, a Grav. Group, a Mack, or a Gerstlauer."

So, what does that leave (of more 'major' manufaturers)? Intamin, Premier, Vekoma, Arrow, what else?

Arrow is defunct, they were bought by S&S.

Oh yeah. I knida forgot about that. But, now that you say it, I remember reading that a while back...

Link to comment
Share on other sites

Not to mention that Six Flags Magic Mountain is getting a new roller coaster for 2010. That would tie them with Cedar Point for the most roller coasters, taking away their "Most roller coasters in the World" record.

Before you say the public doesn't care, uh, Cedar Fair does. We all know how much they love records, especially a record like that for their flagship park, I don't see them not doing anything about it.

And if CP doesn't add something next year, MM might decide to add another coaster in 2011 to go ahead of CP or (more likely) stay tied (CP would more than likely add something in 2011 if not 2010). Also, MM is supposed to be adding a kids area themed to the Wiggles in 2011 (according to Wikipedia :lol:), so they would probably add a kids coaster. So, if CP adds one coaster in the next two years, and MM adds two, they will be ties. I don't see that sitting well with Mr. Kinzel.

Link to comment
Share on other sites

Well CP would automatically have to add a new coaster is MM got ahead of them! If they love records, then they would want to keep that record. And they HAVE to have a new coaster at least by 2011. That would be crazy. 4 years of nothing except for what might be a log flume?

Link to comment
Share on other sites

It could be read that way. But it doesn't confirm anything really. 2 down, one to go could mean major holidays in the summer for all we know. Memorial Day and Independence Day are past, Labor Day is coming. Just saying.

^And I kind of agree... but I think it's more of a chance for good marketing than it is to give it a record.

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

 Share

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...