Kat Posted September 25, 2013 Share Posted September 25, 2013 Probably most inverted roller coasters have a lift hill! Ha ha I was just noting the layout and apparent size and angle of said lift hills in addition to the near identical color of the track and supports (more the supports than the track) I don't care if it was a copy cat though it's still new to us and will be an awesome ride. And only the second full invert I will have ever been on unless I am unable to ride Raptor Friday or Saturday 1 Link to comment Share on other sites More sharing options...
Kat Posted September 25, 2013 Share Posted September 25, 2013 It's considerably different compared to when you compare other B&M inverts to each other. Well that's good to hear! Link to comment Share on other sites More sharing options...
sheikra_rocks Posted September 25, 2013 Share Posted September 25, 2013 I have ridden Patriot, and it looks nothing like Banshee. Patriot is a very smooth ride, but it does not pack a punch. Montu on the other hand? Humina humina humina! 4 Link to comment Share on other sites More sharing options...
thedevariouseffect Posted September 25, 2013 Share Posted September 25, 2013 And we all have not ridden a B&M Invert with these trains before..I'm sure this will be a brand new experience, and almost like riding an invert for the first time again 4 Link to comment Share on other sites More sharing options...
fryoj Posted September 25, 2013 Share Posted September 25, 2013 Looks like they are building the tallest lift hill support! 1 Link to comment Share on other sites More sharing options...
upstop Posted September 25, 2013 Share Posted September 25, 2013 You are correct!.....(batteries not included....assembly required.) 2 Link to comment Share on other sites More sharing options...
Adventuro Posted September 25, 2013 Share Posted September 25, 2013 There is some strange yellow thing towards the middle of the lift, I don't think I've seen it before and I'm not sure what it is Edit: nevermind it's part of a crane Link to comment Share on other sites More sharing options...
Adventuro Posted September 25, 2013 Share Posted September 25, 2013 They are currently lifting the next piece of lift hill track up 3 Link to comment Share on other sites More sharing options...
HTCO Posted September 25, 2013 Share Posted September 25, 2013 Track is in place. Plot twist: It just misses the existing support by a couple feet EDIT: 6 Link to comment Share on other sites More sharing options...
upstop Posted September 25, 2013 Share Posted September 25, 2013 I'm shocked that they are going to build the loop around the constructed part of the lift hill, instead of building the loop first. Hope there are no windy days ahead. Link to comment Share on other sites More sharing options...
HTCO Posted September 25, 2013 Share Posted September 25, 2013 And now it looks like a crane is positioned at the bottom of the first drop to possibly place a piece of track in? Link to comment Share on other sites More sharing options...
NoChickens Posted September 25, 2013 Share Posted September 25, 2013 Seems logical enough to me, put the top of the loop on like a cap. I think it would be harder to thread the track though the loop if it was in place first. Needless to say I've not built one in the real world. 1 Link to comment Share on other sites More sharing options...
thoe124 Posted September 25, 2013 Share Posted September 25, 2013 That's probably what they'll do. Link to comment Share on other sites More sharing options...
fryoj Posted September 25, 2013 Share Posted September 25, 2013 And now it looks like a crane is positioned at the bottom of the first drop to possibly place a piece of track in? I think that yellow crane is just a taller crane that the one that has been on site since the beginning. The original crane is going to be too short to do any more of the lift. So that yellow one will be there long enough to help Clifford finish the lift out then it'll be gone. Where its sitting now should be where it does the pick for the lower part of the next piece of lift hill track. Link to comment Share on other sites More sharing options...
upstop Posted September 25, 2013 Share Posted September 25, 2013 Seems logical enough to me, put the top of the loop on like a cap. I think it would be harder to thread the track though the loop if it was in place first. Needless to say I've not built one in the real world. Seeing it from your view, I have to agree. I kind of thought they would create the lower part of the loop first then finish the lift, then cap it off....I guess it really all depended on where the end of the lift hill track piece ended....plus all of the loop supports would have been in the way too. 1 Link to comment Share on other sites More sharing options...
thoe124 Posted September 25, 2013 Share Posted September 25, 2013 What's the yellow spot behind the bathrooms? Link to comment Share on other sites More sharing options...
upstop Posted September 25, 2013 Share Posted September 25, 2013 ^^ that's the SOB photo booth. Link to comment Share on other sites More sharing options...
thoe124 Posted September 25, 2013 Share Posted September 25, 2013 ^^ that's the SOB photo booth. Oh thanks! Link to comment Share on other sites More sharing options...
PyroKinesis Posted September 25, 2013 Share Posted September 25, 2013 That is one steep lift hill for a B&M coaster. 2 Link to comment Share on other sites More sharing options...
RailRider Posted September 25, 2013 Share Posted September 25, 2013 Regarding the loop and lift hill issue. The loop will more than likely be 6-8 sections of track. So you are dealing with much smaller pieces when lifting compared to the huge pieces of lift track. 1 Link to comment Share on other sites More sharing options...
Adventuro Posted September 25, 2013 Share Posted September 25, 2013 Right now they're lifting up another piece of lift hill track, I'm not sure how they can already put that up though, unless they're just moving it. Link to comment Share on other sites More sharing options...
fryoj Posted September 25, 2013 Share Posted September 25, 2013 Looks like they are picking up the last straight pies of the lift hill. We should have a pretty close look at how tall this thing is going to be today. Link to comment Share on other sites More sharing options...
CoasterMyths79 Posted September 25, 2013 Share Posted September 25, 2013 Does anyon know if anyone owns a Son of Beast plaque and if they would be willing to sell it? You know, the ones that they sold in October last year. Link to comment Share on other sites More sharing options...
thoe124 Posted September 25, 2013 Share Posted September 25, 2013 Yay! 5 Link to comment Share on other sites More sharing options...
Diamondbacker Posted September 25, 2013 Share Posted September 25, 2013 It's going quickly! I think that's the last piece for the lift hill, then it starts down the hill! Link to comment Share on other sites More sharing options...
RailRider Posted September 25, 2013 Share Posted September 25, 2013 Well there will be at least one more support lifted today because I am sure they will not leave that load on a crane for long. Looking very very tall right now Link to comment Share on other sites More sharing options...
Ki Man Posted September 25, 2013 Share Posted September 25, 2013 What's the yellow spot behind the bathrooms? It's the Banshee Creature you're so crazy about. Link to comment Share on other sites More sharing options...
fryoj Posted September 25, 2013 Share Posted September 25, 2013 Well there will be at least one more support lifted today because I am sure they will not leave that load on a crane for long. Looking very very tall right now This piece doesn't tie into the next support. They would have to build the last support tower and install the top piece of lift track to tie it into the support. Not to say they won't do all that today. They do work late into the evening and they aren't going to want to keep that yellow crane on site longer than needed. But that would be a lot of work to complete before dark. Link to comment Share on other sites More sharing options...
Adventuro Posted September 25, 2013 Share Posted September 25, 2013 If you look at the animations, there is another piece of track that curves, but still goes a bit higher, that would be what connects it to the ginal support. Link to comment Share on other sites More sharing options...
upstop Posted September 25, 2013 Share Posted September 25, 2013 More lift hill just went up!!! 1 Link to comment Share on other sites More sharing options...