Jump to content

Adventuro

Members
  • Posts

    414
  • Joined

  • Last visited

Everything posted by Adventuro

  1. What people don't realize it that KI doesn't do the things they do to upset people or make it difficult, they have their reasons, this time it was a safety issue.
  2. Side note about Diamondbacks bins! They just installed locks on them so only your train can access your bin.
  3. I feel like most people would just assume it was a first come first serve basis.
  4. The actors were cool and all back then, but nowadays people just don't like the idea of guns pointed at their faces. Also side note, I think the conductors do a pretty nice job of speiling informative and funny things, it still is a ride they make it unique. It just happens to stop at SC.
  5. Where does KI say they have 14 coasters? Cause everywhere says 13, Surf Dog isn't a coaster because it is mostly powered, so racer would have to be counted twice.
  6. I find that it's smoother in the back middle seat.
  7. Obviously the ride op knows about the bins, they're just annoying because you have to walk far to put your stuff in them.
  8. Maybe they have told B&M to be more secretive and the track is being stored at another location. I think this time around they don't want it leaking.
  9. Who wants to be that person though that does that.
  10. Okay, excluding snoopy the only rides that do not have bins are FOF, and Firehawk, some rides don't have bins, but more like shelves, example Viking Fury
  11. This makes me proud! http://www.cleveland.com/metro/index.ssf/2013/06/cedar_point_kings_island_rank.html
  12. I believe the announcement will be made at NIGHT. Think about it, if the ride is supposedly a "scary" themed attraction... Wouldn't they want to make the announcement at night. That's an angle to look at Don's tricky statement.
  13. I think people will figure it out by then anyways, if its not announced by August.
  14. Splash dance is considered a ride, it's in the rides dept.
  15. The more I examine the picture, I do think that it is very likely that slingshot could be moved back. It would make sense to open up AZ a little bit, especially with this new ride they will want it easier to get to.
  16. I hope it doesn't cost 250k to install bathrooms
  17. But if you think about it, this construction started in late 2012 with the removal of SOB. So late 2012 is equivalent to late 2007 here. Also the land was already clear for this.
  18. Which was right about the time there was an official announcement wasn't it? Yes, just a week or so before the announcement. I'm hoping for a Fourth of July weekend announcement
  19. So if we follow Diamondbacks construction timeline, which appears to be similar to this project, by the end of July track theoretically should be appearing on the site.
  20. How so? Because what some people think is rough may not be rough to others. Like I think Vortex is rough, but I've actually heard some people say it's smooth.
  21. If a roller coaster is rough or not is solely opinion- based if you think about it.
  22. Can you say this for sure? I swear I saw a green smokestack more than once. Yes I am 100% sure, we rode the train twice, and the conductor made a comment about green being lazy, and in the engine house all day, just because people saw blue sitting in SC as per the video above, doesnt mean blue is the problem. If one train is down I'd imagine the other cant move
  23. Green was not running, it was blue all day
×
×
  • Create New...