Whatever6750 Posted September 22, 2008 Share Posted September 22, 2008 Didnt have time to whip something up until now. Hows it look? Link to comment Share on other sites More sharing options...
Beast1979 Posted September 22, 2008 Share Posted September 22, 2008 ^You forgot part of the biggest support Link to comment Share on other sites More sharing options...
Whatever6750 Posted September 22, 2008 Share Posted September 22, 2008 Yeah I didn't want to put it yet because I was a little unsure exactly which support that is and how much of it should be colored. Will though if everyone likes. EDIT: I'm a little slow today. That must be the tallest support no? Guess Ill just color it like half way or something. EDIT 2: How about this, Link to comment Share on other sites More sharing options...
RailRider Posted September 22, 2008 Share Posted September 22, 2008 Yeah its big real big. The skyline will forever be changed. Just wait till the lift hill and 2nd hill tower over the park. This thing is impressive Link to comment Share on other sites More sharing options...
FOFreak Posted September 23, 2008 Share Posted September 23, 2008 It'd be cool to see a "Before" and "After" photo of the pregression between work days using that photoshop! Link to comment Share on other sites More sharing options...
Beast1979 Posted September 23, 2008 Share Posted September 23, 2008 Check the webcam they have fully erected the next support and are lifting the next 2 track pieces into place. Link to comment Share on other sites More sharing options...
LongLiveTheSmurfRide Posted September 23, 2008 Share Posted September 23, 2008 Wow, that's impressive. I can't wait to see all that's been finished when I go to the Haunt. Link to comment Share on other sites More sharing options...
nhimes90 Posted September 23, 2008 Share Posted September 23, 2008 Does anybody wish they would move some of the webcams now that there done in two areas Link to comment Share on other sites More sharing options...
firehawkboy Posted September 23, 2008 Share Posted September 23, 2008 Yes I do! They need to put one so we can see the Hammerhead Turn and the midway. And maybe get a faster FPS image like Carolina Cobra. Their camera switches to a new image every 2 seconds. And their coaster isn't even as amazing as DB. Link to comment Share on other sites More sharing options...
tigellinus Posted September 23, 2008 Share Posted September 23, 2008 ^^YES!!! Wow, that's impressive. I can't wait to see all that's been finished when I go to the Haunt. Well, for an alleged ~200 ft 2nd hill they still have a ways to go!! The Crypt building is what? 140 feet?? The track is barely eclipsing that now...more track should still be added if this 2nd hill is really going to be near 200' for the 193' 2nd drop! But what they have now looks good so far and is a great start!! Link to comment Share on other sites More sharing options...
RailRider Posted September 23, 2008 Share Posted September 23, 2008 ^^YES!!! Wow, that's impressive. I can't wait to see all that's been finished when I go to the Haunt. Well, for an alleged ~200 ft 2nd hill they still have a ways to go!! The Crypt building is what? 140 feet?? The track is barely eclipsing that now...more track should still be added if this 2nd hill is really going to be near 200' for the 193' 2nd drop! But what they have now looks good so far and is a great start!! You must remember that the drop on the 2nd hill drops in to the ravine, so the structure may not rise 200ft in the air, kind of like Phantoms Revenge Link to comment Share on other sites More sharing options...
nhimes90 Posted September 23, 2008 Share Posted September 23, 2008 So I was looking around the construction photos yet again, and I came across this picture. Just look at what that area used to look like! It's so different. There used to be a bunch of trees, but something better will be coming. I just hope they plant some trees in place of the old ones. Link to comment Share on other sites More sharing options...
RailRider Posted September 23, 2008 Share Posted September 23, 2008 The 2nd hill is huge, look at the angle on this thing. Anyone else think this will be a massive airtime hill? Also the curve that makes up the 1st drop pullout and the entry to the 2nd hill looks amazing. Link to comment Share on other sites More sharing options...
flightoffear1996 Posted September 23, 2008 Share Posted September 23, 2008 That hills looks steep and a great deal of fun! Link to comment Share on other sites More sharing options...
firehawkboy Posted September 23, 2008 Share Posted September 23, 2008 ^ Oh yes!! That angle descent looks about as steep as the first hill drop. And especially if they put the crest piece up next, air time will be a key factor in this hill. Link to comment Share on other sites More sharing options...
standbyme Posted September 23, 2008 Share Posted September 23, 2008 This afternoon Link to comment Share on other sites More sharing options...
firehawkboy Posted September 23, 2008 Share Posted September 23, 2008 Holy crap! I didn't even realize all those supports! I hope they go up soon!! Link to comment Share on other sites More sharing options...
House Posted September 23, 2008 Share Posted September 23, 2008 I can't see those pics are blocked by my companies firewall. Can you email them to me? Link to comment Share on other sites More sharing options...
Thrill_Biscuit Posted September 23, 2008 Share Posted September 23, 2008 It looks like one of my old cheap RCT shuttle coasters right now... Link to comment Share on other sites More sharing options...
flightoffear1996 Posted September 23, 2008 Share Posted September 23, 2008 Its starting to take shape! Link to comment Share on other sites More sharing options...
Fear the Offseason Posted September 23, 2008 Share Posted September 23, 2008 The webcam is done right now for me. Is this happening for anyone else?? Link to comment Share on other sites More sharing options...
Beast1979 Posted September 23, 2008 Share Posted September 23, 2008 Lord, that Second Hill is Huge! The animation doesn't do justice at all, and just remember that is only about halfway up the second hill! And it looks like they have installed yet another: Link to comment Share on other sites More sharing options...
hausty1983 Posted September 23, 2008 Share Posted September 23, 2008 The webcam is down right now for me too, that drop into the ravine is going to be awesome atleast they are going to make this ride use there terrain back there just like The Beast does also i'm so excited!!! Link to comment Share on other sites More sharing options...
House Posted September 23, 2008 Share Posted September 23, 2008 It looks like they might be installing another piece right now! Link to comment Share on other sites More sharing options...
Fear the Offseason Posted September 23, 2008 Share Posted September 23, 2008 Okay it is back up for me. Man oh man that second hill is going to be huge. I like how it is at an angle at the bottom of the hill too! Link to comment Share on other sites More sharing options...
Thrill_Biscuit Posted September 23, 2008 Share Posted September 23, 2008 Looks like our baby is about to emerge from the treetops! Link to comment Share on other sites More sharing options...
Beast1979 Posted September 23, 2008 Share Posted September 23, 2008 Where'd the crane go? Link to comment Share on other sites More sharing options...
markalan Posted September 23, 2008 Share Posted September 23, 2008 Not in the treetops yet. That last piece that was installed is on the return track. Link to comment Share on other sites More sharing options...
Beast1979 Posted September 23, 2008 Share Posted September 23, 2008 I'm starting to wonder when the Yellow supports will end! Link to comment Share on other sites More sharing options...
fryler87 Posted September 23, 2008 Share Posted September 23, 2008 Wow. I cannot wait to come back from co-op for Thanksgiving to see this thing towering over the park. Link to comment Share on other sites More sharing options...
Recommended Posts