15 minutes ago, MaestroJr said:

Something that I never really thought about is who tears down the ride does Sally come in and do it or does Kings Island themselves do it?

Sally is the manufacturer responsible for both Boo Blasters and Phantom Theater Opening Nightmare, so it would be them making modifications to the existing Boo Blasters ride, rather than it being entirely torn out.

Although if this was a situation of a ride being torn out, it would've been handled by O'Rourke Wrecking Company, which were contracted for previous demolition works like Vortex and Firehawk.

Link to comment
Share on other sites

12 minutes ago, WoodVengeance said:

Sally is the manufacturer responsible for both Boo Blasters and Phantom Theater Opening Nightmare, so it would be them making modifications to the existing Boo Blasters ride, rather than it being entirely torn out.

Although if this was a situation of a ride being torn out, it would've been handled by O'Rourke Wrecking Company, which were contracted for previous demolition works like Vortex and Firehawk.

I see thanks for the info, it’s something that I never really thought about, I do wonder if they’ll save any parts of boo blasters and reintegrate them into phantom theater. I hope boocifer stays around 

Link to comment
Share on other sites

4 hours ago, johnjniehaus said:

I know right! To be honest they could just be ripping out boo Blaster at the moment, no clue if there's any more progress on phantom or not 

They’re working on clearing out the props from the building and work is being completed in Florida I assume for Phantom, don’t worry. I think there’s just going to be a week where guests return on a random Friday during haunt and the outside entrance of Boo Blasters is just completely gone. It also is an indoor ride that’s technically a retheme vs brand new ride, so it could be a thing were everything’s taken out of boo blasters over a week (which I’m 80% sure has happened by now), Phantom props are brought in a Winterfest or off season week, and the ride can still be ready for like April.

 

Personal speculation, but I think on October 31 (or maybe October 13 because spooky number and it’s not on a weekend day) we’ll see some major teasers hopefully showing off the designs for the characters we haven’t seen yet properly because I need proper references to draw them! 

  • Like 5
Link to comment
Share on other sites

On 9/26/2025 at 3:07 PM, MaestroJr said:

Something that I never really thought about is who tears down the ride does Sally come in and do it or does Kings Island themselves do it?

I was working in tech services in 2002 when phantom theater closed, we (tech services, ride mechanics and electricians) cleared out most of phantom ourselves. We took out all the animatronics, props, scenes, sound equipment etc. we initially moved all the animatronics to the “schoolhouse” which was located at the employee entrance on western row rd. Picture attached of the old school house and they stayed in that building until they started using them as props for haunt.  after we cleared everything is when sally came in to install SDATHM, we worked along side of them installing all the controls, audio equipment etc but they did most of the installation. 

IMG_1462.png

  • Like 2
  • Thanks 1
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

 Share

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...