-
Posts
2,108 -
Joined
-
Last visited
-
Days Won
1
Content Type
Profiles
Forums
Calendar
Everything posted by YoungStud
-
That would allow three train operation. Firehawk takes forver to load and FOF is not dual loading. it has seperate load unload and only run 2 trains.
-
coasters have changed a little bit since he was the gm....
-
who is dennis speagel. WHat is there to decode? It has the invert job # on the blueprint.
-
Do it like a flyer.
-
The train shead looks like a three train shead to me.. dual station....
-
More than likely a dual loading station.
-
They only need a little over 4k' of track to set the record. It is possible. SOB was 7K long.
-
the news are not enthusiasts, heck they may not even have ever been on a coaster.
-
We may not get much theming due to the size of this ride IMO. I am glad there appears not to be a MCBR,
-
maybe patrick michael is big sexy
-
if your going to spend that coin to build a invert you may as well build it to about 200' to overtake alpengeist.
-
I think we have came to conclusion that if the person spent a year of his life to do the blue print he is in pretty bad shape.
-
I would ask to talk to management if there is one train operation, thats just me though.
-
I would hate to not get the bread stick but still be charged the same ammount.
-
200' or so, 70 mph or so, 7 inversions. It looks good on paper. Hopefully the elements are not over engineered....
-
how much do you save?
-
6,7, or 8 inversions?
-
do you get a extra slice of pizza instead of the bread stick then?
-
What does everyone think the record is. Tallest and fastest full circuit invert?
-
usually everything is a walk on at holiday world.
-
so if there is no mcbr will there be a dual station? It will take a while for a invert to climb a 200' lift and go through its course and just run two trains.
-
I don't think I will ride it.
-
If they build a 200' plus invert, its only right to build a 400' lift hill coaster down the road.
-
its a double element. Two immelmans?
-
If it was intamin then yes.