Jump to content

gforce1994

Members
  • Posts

    2,111
  • Joined

  • Last visited

  • Days Won

    4

Everything posted by gforce1994

  1. However, a red flag means there will be electrical lines placed there.
  2. Or you do the work while everyone is distracted by Mystic Timbers.
  3. It is quite clear that something is up, since the volume of the fill is larger than the accounted volume of the excavations from the construction this season. That alone means land is being excavated/filled in, but from where, and why?
  4. I'm wondering if the recent work done on Western Row Road is the culprit behind these issues.
  5. Yes, but the land that is excavated way exceeds the size of fill for the three sites. Plus storage buildings require mat footings, so the amount of soil excavated would be minimal in this situation.
  6. But Mystic Timbers didn't need a fill/excavation. Most of the ride was placed on terrain, exception being the footers for the steel trusses supporting the sections over water. So where is this dirt coming from?
  7. It's a complicated situation. The park is generating it's own power, but I believe some power is used from the Mason utility lines. The park is not losing power, rather, all the events are happening outside the park property. That being said, when a power event occurs, it is important to shut down the park power so that the grid doesn't overcompensate for the lost power and blow a fuse. If one wants to look at a situation like this happening in big scale, look at the 64 blackout that took out power entirely in 7 states.
  8. gforce1994

    Funpix

    I've gotten a glitch where if you try to activate the barcode for the borders, if you switch from the away facing camera, you get this image as a result.
  9. It might be leftovers from the Safari, since the stuff being moved looked like it came from a structure.
  10. True, but that doesn't explain the reason why they had bulldozers Closer image shows what looks like is a bulldozer.
  11. This sighting even makes the sight weirder.
  12. There are survey markers that have been placed by The Bat queue. Attatched is a photo. A red marker indicates electrical line or conduit. Thoughts? Im thinking it's a case of Ash Bore. Or not. There's demo going on, image from twitter Theres something being demolished. It’s behind GWL.
  13. Or the (s)Headless Horseman overlay. I know that's terrible
  14. Yes! Evil Santas and Evil Reindeers for Winterfest! Jk.
  15. Wood that have been nice to witness.
  16. Mystic has a 50 minute wait.
  17. Here's one that irked the engineer in me: "Why did they build the coaster out of wood? Nothing is ever built of wood."
  18. It acts like a coaster, and when powered coasts like a roller coaster. It sometimes valleys like a coaster, so why isn't it called a coaster?
  19. As Trump would say: FAKE NEWS!!! Ive just seen Firehawk running with riders.
  20. Talk about flying phones, I was on the ride with a friend and saw a phone fly out of someone's hand on Diamondback. Fortunately, it was on the second hill, so it flew away from the riders.
  21. I always thought a ride on Snoopy's Robot would be an interesting dark ride idea.
  22. And................................ King's Island released their Fast Lane deals today. HOWEVER, no season long Fast Lane pass included. I would have used it on MT and WG if it was available.
×
×
  • Create New...