Jump to content

Cedar Points 2007 Project


Recommended Posts

  • Replies 62
  • Created
  • Last Reply

Top Posters In This Topic

In my opinion, it's going to be an aquatrax coaster. I truly believe that they are wanting to replace a water ride with another water ride. It was mentioned by Dick Kenzel a few years back when they bought maXair. The year maXair was installed, the original plan was to install a ride where White Water Landing was, but that plan was pushed back a couple of years.

Link to comment
Share on other sites

They are surveying over by the Cedar Creek Mine Ride, if you have visted the park lately you would notice the crews over there and also the number of survey flags. Anyone find it strange they have started laying track so soon. I know winters on the lake are harsh, but they have not started a coaster this soon for a long time. Look at Millie and TTD and when they were started. Aquatrax, possibly, but CP is not much for theming which would be the most logical reasson for starting an Aquatrx so early. Look towards Port Adventura for answers.

Cant wait for next seasson on the lake.

Link to comment
Share on other sites

Yes it does have low points, but if the passengers are locked in position either flying or sitting I still feel that there would be enough clearance. Atleast from everything I have seen so far. I think it is still very plausible for it to be more than an Intamin Twister, especially from what I have been told.
Link to comment
Share on other sites

Aquatrax going upside down? First Inversion Started

Well so far we have a giant high speed banked turn, a great airtime ejector hill, LIM type track spotted, and an inversion almost completed. Anyone still pushing for the Aquatrax coaster?

Remember this is some of the earliest construction CP has ever started laying track in recent history.

Maverick will be coming soon...

Link to comment
Share on other sites

I have a feeling this thing will be massive, well long any ways (due to track assembly so soon) I also think this coaster will be a new type of coaster, because of all the weird aspects that everyone speaks of. Maybe that would be another reason for starting construction so soon, if it would be maybe a new prototype coaster they will have plenty of time to work the kinks out. unsure.gif

-Chris

Link to comment
Share on other sites

I was up there thursday and couldnt belive the massive amounts of track now sitting behind breakers and I saw the first inversion, very cool. I heard a different colored track was spotted?

If a different color track was spotted, perhaps they are trying to throw us off. Perhaps the ride will be called The Leopard...

--The Interpreter, running for his room

Link to comment
Share on other sites

Weird, 9 days would make the announcement on the 7th. Funny, an employee at CP told me that would be the announcement day for Maverick. Funny, he also told me some other things, including some aspects of the ride. But whoops, I have to keep my mouth shut about the ride.

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

 Share

  • Recently Browsing   0 members

    • No registered users viewing this page.



×
×
  • Create New...