Like KIfan1980 said, running 3 trains is possible. I heard Vekoma's flying dutchman trains were intended to recline on the lift and sit back up on the break run. From what I understood, this put a lot of wear and tear on the GAU motors and the hydraulics. I know Batwing at Six flags America reclined on the lift in the early 2000's. Not sure if this was done on X-flight at Geauga. Without reclining the trains on the lift and lifting them back up on the brake run, the 3rd train would sit on the last block before the station even longer.