Jump to content

Latest Construction Update 7-23-08


BoddaH1994
 Share

Recommended Posts

When I think livestock, I don't normally think of horses, but rather of cows, pigs, sheep and goats. Somehow, I don't see them naming the coaster after any of those.

Heifer: The Ride!

Actually, horses are considered to be livestock as they often provide farm labor.

It's kinda unusual but chickens, ducks and turkey's are not normally considered to be livestock. (That reason I do not know why.)

..... WooferBear - the Good Country Bear That He is.

Link to comment
Share on other sites

Im sure this is what you meant, but just clarifying.

The design layout is complete, afterall we aren't designing on the spot. Footer here, Footer there, Here a Footer There a Footer, a Footer Everywhere. The engineering design is done.

What I think you were implying is that they may not have all the footings poured yet. I would agree, there may be a few footings left to pour, but the majority should be done by HH and Vertical construction well underway. I would say the lift hill and first drop will be some of the last work since it goes over RiverTown and they will more than likely be working on the path. The Train will be very popular during HH...

Link to comment
Share on other sites

There is absolutely no way it will be finished before HH. Honestly i would be surprised to even see any track up before then. I would assume they would do the construction over the midway when the park is closed. What is up with the clearing behind SOB's rose bowl?

Link to comment
Share on other sites

There is absolutely no way it will be finished before HH. Honestly i would be surprised to even see any track up before then. I would assume they would do the construction over the midway when the park is closed. What is up with the clearing behind SOB's rose bowl?

Are you kidding? Behemoth's lift finished in mid October if i remember correctly.

Link to comment
Share on other sites

There is absolutely no way it will be finished before HH. Honestly i would be surprised to even see any track up before then. I would assume they would do the construction over the midway when the park is closed. What is up with the clearing behind SOB's rose bowl?

This has been asked many times and the consensus is that it is fill dirt for the new coaster construction.

Link to comment
Share on other sites

I dont see any reasson that the majority of Vertical Construction shouldn't be done by HH, the only major part left will be the lift hill and sections that cross the midway. Those will be completed during the off seasson since it will be easier to work in midways then. I would imagine that 60% to 75% of vertical construction could be complete by the end of HH.
Link to comment
Share on other sites

Because more than likely the midway will need to either be completely replaced or repaired once the lift is installed, with all the construction trafic going over it. So I wouldn't expect them to close Rivertown for HH because that Midway will be all new next year.
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

 Share

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×