Hi, I'm back to once again overly fixate on this project.
I have composed what we know from blog posts and the KIC podcast (Ep. 20) to concoct my next interpretation of the work they are doing on Beast. The visual to supersede all past visuals I have posted here, showing a combination of everything we know and places where we know work is happening (but aren't sure which parts of these are!). I do hope to eventually post a final visual when we get more confirmations and when we are sure of everything they are doing off-season.
Original Photo Credit: Google Maps Satellite Image
Everything in green is 100% confirmed, we know these are spots they are working on.
Everything in red-green and red-yellow is somewhat confirmed. We know, according to the podcast, that KI is working on the second drop area. What parts of that is unconfirmed, but the entire section is highlighted anyway. I may have placed Sycamore Hollow wrong, as a hollow is typically a valley of sorts. I know that the second drop is in a valley, so that is likely where sycamore hollow actually is, but it's fine where I put it in this visual.
The helix, based on the blog post image from Mr. Helbig is speculated to be re-tracked to some degree in-house; whether it's partially or fully re-tracked. I posted a set of images similar to this on my Twitter profile, but this is basically combining those into one photo.
Finally, looking at the turn before Coon Tunnel, we know that Gravity Group passed over engineering to KI so they could perform work there too. Hopefully that spot won't be so bouncy anymore!
Really looking forward to a backstage tour of this at Coasterstock this year, hopefully that's on the itinerary again!
Apologies for the edit, for some reason the site posted the same image a second time after my first paste.