Jump to content

Hawaiian Coasters 325

Members
  • Posts

    3,752
  • Joined

  • Last visited

  • Days Won

    86

Everything posted by Hawaiian Coasters 325

  1. I think was a little skinny stream of water flowing through there at one point.
  2. My main question is how will people get to field of screams this season during construction?
  3. Yeah! I saw it on a drone video on YouTube that I tried to upload on here, but I forgotten about the "no drone video" rules so it got taken down.
  4. So you went flying again? Can you do us a favor and fly a lot during the off season? Thanks!
  5. Here are some clear pics from Buckeye Coasters on Facebook. He was at p&g day today!
  6. I definitely would love an Intamin blitz, but unfortunately I think it's a very low chance we'll ever see an Intamin coaster in the Cedar Fair chain again!
  7. Are the workers off today? Doesn't look like much is going on right now.
  8. I feel that if KI were to get an RMC, it would be a ground up topper track because KI likes being known for their woodies and would probably want to add more to their already awesome wooden coaster collection. Also, I think it would be different enough from Steel Vengeance. Steel Vengeance is a wood steel hybrid and this would be considered a wooden coaster (even though it's different than a traditional wooden coaster).
  9. Also, RMC was new to Cedar Fair so it took them a while to get most of the problems fixed. Lightning Rod was the first ever launched woodie so that's why it had all that downtime. It was a new type of coaster that has never been done before. Of course there will still be some downtime here and there, but that's part of a rollercoaster. All coasters even the most reliable coasters will have downtime at some point. I do hope that Cedar Fair continues to work with RMC and build nice coasters even at KI! And maybe build some raptor models at some of the smaller parks and maybe build one of the first giant Trexes at Cedar Point!
  10. I think what's going to happen is they'll put up the brake run and then after that is done in about a week or so if you ask me, then they'll start on the lift hill. They'll have to get the large cranes in before they start on the lift hill. Banshee I think started with the transfer track area and then brake run and then lift hill.
  11. They seem to be lifting another piece or at least getting ready to.
  12. That looks about right. Also, I'm probably just imagining things, but they look to be moving one of the turn into station track pieces. EDIT: I think that track piece is being put into place!!!! EDIT: That piece is in place!!!!
  13. They seem to be laying something down under the station track. Looks yellow from the webcam.
  14. If we don't get an RMC woodie, I would like to see us get a giant gravity group woodie! Maybe a mix of Voyage and Hades 360! Plus Gravity Group is based just a few miles from Kings Island in West Chester!
  15. RMC said they would like to do more ground up ibox coasters, but I believe they will still build the topper track coasters if a customer wants it.
  16. Kentucky Wildcat fans, check out Chad's recent tweet!
  17. Orion to me looks like a mix of Fury and Leviathan, but more closer to Leviathan than Fury. So I think it's better to compare this to Leviathan.
  18. I think we could get something along the lines of Goliath at Six Flags Great America! Also, I think they could take out Congo Falls/Timberwolf for this. In fact right next to The Bat's station there is a drop off there and they could use that to their advantage and make the drop bigger than the height. Another plus to you could get a nice view of the drop from The Bat's exit.
  19. I don't expect too much track to go up for about another week or maybe longer. They probably have other priorities right now, but I've been wrong before.
  20. Here I made this. Link to site where image was found:
  21. I wonder if someone will do a documentary on Orion
  22. Here's a nice video on the making of Fury 325!
×
×
  • Create New...