TheBEASTunchained Posted November 4, 2013 Share Posted November 4, 2013 Construction crews starting to arrive at the Banshee site this morning..... 4 Link to comment Share on other sites More sharing options...
fanofFirehawk Posted November 4, 2013 Share Posted November 4, 2013 Are we expecting a shipment of new supports and/or track, because we seem to be lacking them. Link to comment Share on other sites More sharing options...
MantisMan Posted November 4, 2013 Share Posted November 4, 2013 Hard to see but it looks like another support has been placed. Maybe??? Link to comment Share on other sites More sharing options...
davidw Posted November 4, 2013 Share Posted November 4, 2013 yeah, looks like the next support and the next piece of track too. Link to comment Share on other sites More sharing options...
MantisMan Posted November 4, 2013 Share Posted November 4, 2013 Aaaaaand....another piece of track. They a hard at it this morning. Link to comment Share on other sites More sharing options...
KHFan29 Posted November 4, 2013 Share Posted November 4, 2013 6 Link to comment Share on other sites More sharing options...
PhantomTheaterKiss Posted November 4, 2013 Share Posted November 4, 2013 Every time I check on the progress I am stunned by just how huge it is. Everything else seems so incredibly small in comparison to what is constructed thus far. It almost feels cartoonishly large; I am aware that it truly isn't but even in person it just seemed enormous! Also, I can't wait to see The Bat come to fruition through the same camera view as Banshee. SO. MUCH. EXCITEMENT. 4 Link to comment Share on other sites More sharing options...
Kat Posted November 4, 2013 Share Posted November 4, 2013 good morning everyone! Looks like it's going to be a very busy and productive day at the site today!!! I guess after losing two days due to weather they have a lot to do to play catch up! Barely after 11am EST and already they've gotten a lot done! I never realized the next part of the coaster after the lift hill loop was so high. It looks like it's almost as high as the dive loop! This is going to be one incredible roller coaster for sure! 2 Link to comment Share on other sites More sharing options...
silver2005 Posted November 4, 2013 Share Posted November 4, 2013 Uh...why are they letting the crane build itself into a corner? How are they supposed to get it around to the back of the course to finish the 2nd half? Link to comment Share on other sites More sharing options...
davidw Posted November 4, 2013 Share Posted November 4, 2013 they have a long time before it will be built into a corner. 1 Link to comment Share on other sites More sharing options...
UnrealNightmare Posted November 4, 2013 Share Posted November 4, 2013 These guys are professionals. I'm sure they know what they are doing. 6 Link to comment Share on other sites More sharing options...
medford Posted November 4, 2013 Share Posted November 4, 2013 ^^^ This isn't their first trip to the rodeo; the construction schedule and sequencing has passed thru so many eyes, people with lots of experience doing this kind of thing, I have full faith that things are progressing completely as planned. 1 Link to comment Share on other sites More sharing options...
Existential Posted November 4, 2013 Share Posted November 4, 2013 I think KI hired the same team that did this bank overseas: Edit: The picture lost the link after a few minutes. Pointless post is pointless now. Link to comment Share on other sites More sharing options...
fryoj Posted November 4, 2013 Share Posted November 4, 2013 I see what he is saying about building it into a corner. If they put up the next support in line, it really appears that Clifford will be boxed in. Maybe they are planning on moving it now, or maybe they can reach the whole ride from the center area. Of course, this is all based on the ride layout and blueprints. Maybe the there is enough clearance between the footers for the zero G and brake run for Clifford to squeeze through and its all just an optical illusion. I have no doubt that they know what they are doing, but I am curious to see what they do next. Link to comment Share on other sites More sharing options...
gad198 Posted November 4, 2013 Share Posted November 4, 2013 It looks like the first photos of the zero-g roll have been posted to KI's Twitter. My biggest concern about this whole project was whether the roll would have any real "snap" to it. We still need to see how much speed the trains have going into this element, but judging by the shaping in the photo we're in for quite a treat! Link to comment Share on other sites More sharing options...
Kat Posted November 4, 2013 Share Posted November 4, 2013 smaller crane has definitely moved, and it looks like Clifford has moved some, too. Link to comment Share on other sites More sharing options...
diamonbackandbeastlover Posted November 4, 2013 Share Posted November 4, 2013 Riding by the parking lot it seems to look like there are more Clifford pieces in it Link to comment Share on other sites More sharing options...
Kat Posted November 4, 2013 Share Posted November 4, 2013 ^ what do you mean more Clifford pieces? Clifford is still fully assembled... Did you mean Banshee pieces? Link to comment Share on other sites More sharing options...
Kat Posted November 4, 2013 Share Posted November 4, 2013 hard to tell what's going on now.... I see two supports laying on the ground (assuming those are the next to go up) and it looks like they are doing some work down in the valley but not sure what. Link to comment Share on other sites More sharing options...
coasterguy15 Posted November 4, 2013 Share Posted November 4, 2013 It would appear that another crane, similar to Clifford, is being assembled in the valley by the smaller crane. 2 Link to comment Share on other sites More sharing options...
Kat Posted November 4, 2013 Share Posted November 4, 2013 ^ how on earth can you see that??? lol the eyesight that some of y'all apparently have is just incredible. I can't tell that at all, even with the enlarged image opened in a new tab and zoomed in lol 2 Link to comment Share on other sites More sharing options...
Kat Posted November 4, 2013 Share Posted November 4, 2013 and those two supports that were on the ground are now up in the air! Link to comment Share on other sites More sharing options...
diamonbackandbeastlover Posted November 4, 2013 Share Posted November 4, 2013 On my way home from school there were pieces similar to Clifford's but looked smaller 2 Link to comment Share on other sites More sharing options...
Kat Posted November 4, 2013 Share Posted November 4, 2013 So I'm guessing Clifford is either going to move before the next piece(s) of track go up, or he'll go out into Action Zone, down by the bathrooms and around that way. Link to comment Share on other sites More sharing options...
MantisMan Posted November 4, 2013 Share Posted November 4, 2013 Hmmmm, it does appear Clifford will be "cornered in" with the next piece of track. Maybe they will erect a new one down in the valley and Clifford will be dismantled. Lol....I really don't have a clue 1 Link to comment Share on other sites More sharing options...
fryoj Posted November 4, 2013 Share Posted November 4, 2013 If they are assembling another crane on site, I'd assume that means they are about done with everything they need Clifford with and we will see him disassembled and removed from the site soon. Link to comment Share on other sites More sharing options...
Tr0y Posted November 4, 2013 Share Posted November 4, 2013 There moving pretty fast putting this coaster up, probably getting as much as they can done before winter hits, depending in the weather this year i think its possible they could have track layout completed by January... The last things to go in would be the station, que line , and the ring. Then the testing will begin sometime late winter / early spring. 2 Link to comment Share on other sites More sharing options...
Kat Posted November 4, 2013 Share Posted November 4, 2013 I don't think they will be done with Clifford until they are done with construction. It makes no sense to me why he'd be used to assemble the upper half of the coaster (by upper half I mean top of the hill parts) but not the lower half. Link to comment Share on other sites More sharing options...
tubaman Posted November 4, 2013 Share Posted November 4, 2013 I don't think they will be done with Clifford until they are done with construction. It makes no sense to me why he'd be used to assemble the upper half of the coaster (by upper half I mean top of the hill parts) but not the lower half. I'm guessing it probably costs less money to use a smaller crane. So, if they can use a smaller crane, they probably will. Link to comment Share on other sites More sharing options...
GamesAndRides Posted November 4, 2013 Share Posted November 4, 2013 I don't think they will be done with Clifford until they are done with construction. It makes no sense to me why he'd be used to assemble the upper half of the coaster (by upper half I mean top of the hill parts) but not the lower half. I think they used Clifford For the tall parts of the ride (i.e Lift Hill Dive loop and Lift Hill Loop) So i think they will use another smaller crane for the rest of the ride. 3 Link to comment Share on other sites More sharing options...