davidw Posted December 18, 2013 Posted December 18, 2013 3 supports and 3 pieces of track. Link to gallery 14
elyk Posted December 19, 2013 Posted December 19, 2013 Yall need to stop stalking Banshee, she likes her privacy Sent from my iPhone using Tapatalk - now Free 9
KHFan29 Posted December 19, 2013 Posted December 19, 2013 Quiet, you gonna get us caught if you post that here...oh wait. 2
jcgoble3 Posted December 19, 2013 Posted December 19, 2013 I think she'll put up with our stalking for about another four months before she takes her revenge. 11
ChainDog Posted December 19, 2013 Posted December 19, 2013 Very sweet revenge... Sent from my iPhone using Tapatalk 10
myklhicks Posted December 19, 2013 Posted December 19, 2013 only 119 days until media day, ladies and gents. 11
flightoffear1996 Posted December 19, 2013 Posted December 19, 2013 Putting the track up is probably the quickest and easiest steps in building a coaster but it is definitely tge most noticeable 3
GamesAndRides Posted December 19, 2013 Posted December 19, 2013 Id they say more thae 1/2 way done with track/support work! 3
Tuskin Posted December 19, 2013 Posted December 19, 2013 Another support piece. Edit - I kinda wanna play pond hockey on the pond. If only the ice would freeze more and KI invited free open pond hockey sessions. A hockey player can dream right 11
coasterguy15 Posted December 19, 2013 Posted December 19, 2013 Track currently being installed at the bottom of the batwing. 2
myklhicks Posted December 19, 2013 Posted December 19, 2013 "@KingsIslandPR: The next section of track on Banshee going up today: The Bat Wing. #KingsIsland #KIBanshee http://t.co/M67H9S4RwE" 7
MysticsTimber Posted December 19, 2013 Posted December 19, 2013 She's looking beautiful guys!! Sent from my iPhone using Tapatalk 6
davidw Posted December 20, 2013 Posted December 20, 2013 3 supports and 3 pieces of track installed again today. As always, Link to gallery. 12
Gplez90 Posted December 20, 2013 Posted December 20, 2013 Is that the one from yesterday? Sent from my iPhone using Tapatalk
Gplez90 Posted December 20, 2013 Posted December 20, 2013 Oh sorry lol my phone was acting weird i can see it now Sent from my iPhone using Tapatalk
rcwizard13 Posted December 20, 2013 Posted December 20, 2013 They added track at the bottom of the dive loop! And I missed it! And now it's dark and I can't see it! 2
davidw Posted December 20, 2013 Posted December 20, 2013 ^ you can see an archive of my webcam captures with the link in my signiture 7
mikejenkins1 Posted December 20, 2013 Posted December 20, 2013 wondering if they are doing second half of batwing now. Looks like supports that could be used for it. That way they work towards themselves and clifford jr. does not have to lift over exisitng track so much.
Tuskin Posted December 20, 2013 Posted December 20, 2013 ^I still think its Mrs. Clifford. Due to previous photo's of them kissing.
davidw Posted December 20, 2013 Posted December 20, 2013 Due to high winds, not much progress today. Only 1.5 supports installed today. It was an oddly shaped support that has three legs support that actually supports 2 pieces of track. As always, Link to gallery. 10
Outdoor Man Posted December 21, 2013 Posted December 21, 2013 Speaking of webcams... December 21... Spring-like weather... The rain is filling up the wave pool. Crank up the wave machine, don the bathing suits its time for a NEW Kings Island tradition- a 2013 POLAR BEAR PLUNGE! I know, not on topic... but there is a usual spattering of webcam photos on this thread. 15
The Interpreter Posted December 21, 2013 Posted December 21, 2013 It's 70 and sunny here in DC. Still, I bet the concrete and water would be cold! 6
malem Posted December 21, 2013 Posted December 21, 2013 At 65°F, it's warm enough for a regular, non-polar-bear plunge. 5
Outdoor Man Posted December 21, 2013 Posted December 21, 2013 At 65°F, it's warm enough for a regular, non-polar-bear plunge. leave the wet-suit in the car. 3
BB1 Posted December 22, 2013 Posted December 22, 2013 Speaking of webcams... December 21... Spring-like weather... The rain is filling up the wave pool. Crank up the wave machine, don the bathing suits its time for a NEW Kings Island tradition- a 2013 POLAR BEAR PLUNGE! I know, not on topic... but there is a usual spattering of webcam photos on this thread. I don't think any of the lifeguards would like to be on duty in that weather, they're like the Boys of Summer, they come and go with the season. Surpising I wasn't able to get on the forums for a while and come back to this, a week changes everything! 2
TheBEASTunchained Posted December 23, 2013 Posted December 23, 2013 Not sure if this has been mentioned yet....but..... Banshee has now been added to the "Thrill Rides" section of VisitKingsIsland.com https://www.visitkin...do/thrill-rides 5
thedevariouseffect Posted December 23, 2013 Posted December 23, 2013 Also, The Bat is on there correctly right now. Dunno if anyone else noticed it before this post or not 3
FoF96" Posted December 23, 2013 Posted December 23, 2013 I also notice there is no Fast Lane at this time for Banshee, could they be deciding whether to put it in regular or plus? Or simply not include it for the first season?
Recommended Posts