Skip to content
View in the app

A better way to browse. Learn more.

Kings Island Central Forums

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Mystic Timbers Construction Progress

Featured Replies

  • Replies 2.7k
  • Views 557.2k
  • Created
  • Last Reply

Top Posters In This Topic

Most Popular Posts

Posted Images

Yeah, that's what i was thinking......they should've ordered that yesterday or day before so it already there.

 

They will build a lot of bents first, before the crane arrives to save money. By having the bents already built,  the crane can be productive right when it arrives on site, as opposed to sitting around and NOT being productive while they build the bents. Renting a crane isn't cheap. 

I think they would only really need a crane for the first 2 hills.  Most of the remaining layout is pretty close to the ground.  

I'd imagine for the lagoon crossing too. I still am curious how they intend to have that crossed. It looks like simply having taller footings is out of the question.

Maybe something like Ravine Flyer II?

^I'd guess something along the lines of Hoosier Hurricane or Hershey Comet, in that they use an I-beam spanning the water with the truss anchored into it. This can support the bending moment that would be created by multiple point loads along it.

 

 

13975465_1352625648099792_99718353714840

13497812_1309073715788319_43061040611706

I only ruled out typical extra high footers because of the dirt they put in the lagoon to access the other side of it. How close it is to what seems to be the intended path of the coaster. What do I know though?

The thing is that it would be so much cheaper to just put beams to hold the trusses from the bottom if it's just a straight shot. Footers are expensive to do and what it would take roughly 35 to do that way would take only like 6 with steel beams. They only have to do a few footers and throw down some giant pieces of steel to hold it up rather than dig a ton of footers. Now Skyrush has the really tall footers but it's all over the place. Timbers will have only a few rows of load-bearing posts that need to traverse the river, something that could easily be done with a few footers and beams as opposed to one giant, expensive footer per post.

 

I'll be very surprised if they don't do this but in essence, yes. It's like what RFII has in that it's using a frame to hold up a structure of two-force members that can take the bending from the various portions of the two-force posts in multiple spots along the length.

THIS JUST IN!!!  "Boy Trapped In Refrigerator, Eats Own Foot". And now back to the weather. :huh:

Speaking of weather someone needs to wipe off the camera because of the rain on the lens :)

Sent from.... Hello is this thing on?

Speaking of weather someone needs to wipe off the camera because of the rain on the lens :)

Sent from.... Hello is this thing on?

HAHA, thats funny i was just going to say would someone mind going to the top of that building and wipe off that water droplet on the left side of the lens? It disturbs me deeply. :P

Looks like they are starting to extend the footings trenches for the first drop this morning.

Those holes are too far apart to be for footings on a wooden coaster to me. I could be wrong though, but it looks like they were drilling to place steal columns like that did by the rail road tracks.

i was thinking they had only dug out every other row and would go back and dig out the remaining holes after the first were poured....i could definitely be wrong though. :wacko:

GCI footers are connected to one another underground.  This is one of the main reasons their structures are so sound and offer such a smooth ride year after year.

 

Here is a great look at Mystic Timbers Construction that GCI linked to.

 

http://newsplusnotes.blogspot.com/2016/09/scott-and-carol-present-look-at-mystic.html?utm_source=dlvr.it&utm_medium=facebook

Many (newer?) rides use large "connected" foundations between the visible footers/footings that are attached to the structure. This is only more obvious on a wooden coaster as the support structure has more ground connection points.

Am I the only one who finds the bugs flying around the webcam very distracting?

Sent from my XT1585 using Tapatalk

I am having major KI withdrawals right now. :( Is it September 23rd yet??

Sent from my iPhone using Tapatalk

I am having major KI withdrawals right now. :( Is it September 23rd yet??

Sent from my iPhone using Tapatalk

-_- I don't go back until coasterstock 2017. I live 7 hours away. My favorite home park is getting a Planet Snoopy expansion. You don't know withdrawal. Hold on, I gotta go take my KD2017 PTSD medication. Lol

lots of guys working today, looks like concrete work mainly, I can't wait to see the structure during haunt! 

Am I the only one who finds the bugs flying around the webcam very distracting?

Sent from my XT1585 using Tapatalk

yes they are annoying,...even that little spider that crawls across the lens from time to time and looks gigantic over the background gets annoying too. Sometimes its raindrops that look like bugs flying around the camera. :P  :lol:  :lol:

Guest
This topic is now closed to further replies.

Recently Browsing 0

  • No registered users viewing this page.
Background Picker

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.