BB1 Posted December 27, 2013 Posted December 27, 2013 Kings Island is a tad bit too batty now in days, don't you think? BB1, not to be confused with Bat and Banshee 1. 5
Outdoor Man Posted December 27, 2013 Posted December 27, 2013 KI really needs to install some of these cameras for some good time killing fodder for these boards: (in case it doesn't come up properly in the link... Perfect North Slopes "Live" cameras. http://perfectnorth.com/snow_cams.php?view=2 7
gad198 Posted December 27, 2013 Posted December 27, 2013 The one picture I am really dying to see is a picture taken behind the portion of the batwing being worked on now, showing the zero-g roll in the background. It would be fun to see the scope of the elevation change from the roll down into the valley, and a get truer sense as to how big the batwing really is. 7
myklhicks Posted December 27, 2013 Posted December 27, 2013 support ready to go up by the final brake run! 4
BB1 Posted December 27, 2013 Posted December 27, 2013 Camera just went down Went down to where? Down Under? 6
davidw Posted December 27, 2013 Posted December 27, 2013 one support and one piece of track installed today. Link to gallery 11
Nick_Plummer Posted December 28, 2013 Posted December 28, 2013 surprised they haven't started the turn into the helix from the brake run
davidw Posted December 28, 2013 Posted December 28, 2013 that will probably be the last portion they work on. B&M coasters are usually built sequentially. 8
Gplez90 Posted December 28, 2013 Posted December 28, 2013 Looks like theyre hard at work on this saturday morning! Sent from my iPhone using Tapatalk 4
thedevariouseffect Posted December 28, 2013 Posted December 28, 2013 So wrong..but this fits so well 6
Gplez90 Posted December 28, 2013 Posted December 28, 2013 Ladies and gentlemen, we now have half of a bat! 6
Gplez90 Posted December 28, 2013 Posted December 28, 2013 and as a testament to how bored i am i counted about 44 pieces of track left to be installed lol 7
kirbias1 Posted December 28, 2013 Posted December 28, 2013 The batwing drop looks longer than the drop coming off of the lift! 2
Nick_Plummer Posted December 28, 2013 Posted December 28, 2013 Been at a basketball tournament all morning (2nd place if you guys care) so I wasn't able to refresh my page every second to see them complete that first loop, but here's a pic since no one else has posted it, 7
calakapepe Posted December 29, 2013 Posted December 29, 2013 ^^ NO!! ITS A HALF OF A BAT!!!^^ That's disgusting! There's no way; too messy! 7
davidw Posted December 29, 2013 Posted December 29, 2013 One support and 3 pieces of track installed. First half of The Bat wing is complete. Link to gallery 12
calakapepe Posted December 29, 2013 Posted December 29, 2013 How sweet would this look on Banshee?!?! QUITE sweet! EDIT; it's like RCT3 in real life! 1
Tanna Posted December 29, 2013 Posted December 29, 2013 Ladies and gentlemen, we now have half of a bat! 3
jandyb79 Posted December 29, 2013 Posted December 29, 2013 How sweet would this look on Banshee?!?! That looks like an episode of Who Want's To Be A Millionaire... 9
Spectrum91 Posted December 29, 2013 Posted December 29, 2013 As a friendly reminder to everyone posting pics of the webcam, remember that if you simply link to the live feed, the picture will continually update through-out the day. This means that people who browse the thread at night are met with a bunch of dark images. Instead, save the picture and upload it to another site, like Imgur, so that others can see what you want to share. 13
sheikra_rocks Posted December 29, 2013 Posted December 29, 2013 With this last update, it appears as there are at least 42 sections of track left to hang. 2
sikkinixx99 Posted December 29, 2013 Posted December 29, 2013 They are out in the rain on a Sunday building that beautiful coaster!! Have to Love it!! 4
Nick_Plummer Posted December 29, 2013 Posted December 29, 2013 How sweet would this look on Banshee?!?! How sweet would that look in Flight of Fear! 5
Recommended Posts