Jump to content

Recommended Posts

Posted

7bd5d71e5ef953b87756c1f3f1393194.jpg

871502ec0fd7317ea703e490a10d0635.jpg

c0bcd00d4627cd4775c54dfcc04713f1.jpg

Finally got over to WWC queue to get progress pics.

As I was taking them, a random guy asked me "what, you gonna build your own?"

I wish.

Hey! Let's go back to talking about Mystic Timber CONSTRUCTION, and not just off-topic junk about how to nickname it, or talking about Mean Streak... Anyways. It looks like our first footers are coming in. And It looks like they're making some big footer trenches with pop-up footers (See Diamondback's Hammerhead Turnaround for example.) Is what It will be looking like. 

  • Like 9
Posted

With how much ground is still above it, more than likely it's stabilization of the footers. Especially with how much strain will be on the supports for the curved element right there, and possibly the entire ride.

  • Like 3
Posted

It kind of seems like they have forever to get this thing done (April 2017), but I roughly figure 240 days (only ~160 if they take the weekends off).  Not a lot of time to build an entire wooden coaster and have it ready to open to the public.

  • Like 3
Posted

It kind of seems like they have forever to get this thing done (April 2017), but I roughly figure 240 days (only ~160 if they take the weekends off). Not a lot of time to build an entire wooden coaster and have it ready to open to the public.

Not to mention the weather.

Sent from my SM-G900V using Tapatalk

  • Like 1
Posted

The aerial from the unused train station came from a Cessna 172.  I will try to get up periodically and snap a few shots.  That shot was taken by my 9 year old with an I Phone, so i'm pretty sure I can do better with a real camera. 

  • Like 5
Posted

Am I the only one who has noticed "construction" spelled as "constuction" in the thread title?

I just noticed this as well. Oops! My bad! Going back to change it.
  • Like 4
Posted

It kind of seems like they have forever to get this thing done (April 2017), but I roughly figure 240 days (only ~160 if they take the weekends off). Not a lot of time to build an entire wooden coaster and have it ready to open to the public.

And they have the winter to deal with. Luckily it's not the first time GCI has had to deal with winter construction so.. I think it will all end up okay.

It is crazy how fast coasters can be built, esp. When we see how long it can take for road construction

  • Like 7
Posted

This might sound funny in a way, but in one of those pictures, it looks like construction workers are planting a garden instead of the footers. Lol

 

Well, that seems like it would go well with the "Nature is taking over!" theme. 

  • Like 3
Posted

Hey, friends! This doesn't have anything to do with construction. It does, however, have to do with Mystic Timbers nonetheless. In a different thread/forum here, there has been much discussion about what the spoken nickname should be for Mystic Timbers. MT works well when typing, but it doesn't sound good when speaking. Seeing as so many people aren't huge fans of the name, "Mystic Timbers," we've been trying to come up with a nickname for the ride. And we still have more than eight months to come up with a nickname, because the ride won't open until April at the earliest.

What's your favorite nickname? Please feel free to take the survey below!

https://www.surveymonkey.com/r/6PSDS2Z

Sorry to keep everyone waiting in such suspense! The results are in the link below. The survey is still live, meaning you can still respond to the survey if you haven't already.

https://www.surveymonkey.com/results/SM-FZXLN8DM/

Sent from my SM-T810 using Tapatalk

  • Like 1
Posted

I discovered something on Diamondback when riding.

You can also see this from potato works.

There is a camera on top of the crypt building pointing towards the construction sight. I think this is our construction camera. Or also a security camera. But it may also be used for construction.

  • Like 4
Posted

It will be sad to see either Banshee or Diamondback go away. I wonder if they budgeted in a way to add a webcam rather than move one somewhere else

lol. I read the first sentence of your post before coasterohio's and was like WUT?
  • Like 6
Posted

I was honestly expecting the Diamondback webcam to serve as our construction cam this year. I think the last time a webcam for construction wasn't on the tower (waterpark addition aside) was WindSeeker

  • Like 2
Guest
This topic is now closed to further replies.
  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...