Yes it is illegal, "The taking of pictures while riding is strictly prohibited" and according to ORC 1711.551, whcih states that all guest must follow all verbal and posted rules on attractions, it is a misdeameanor. Also on TR:TR the taking of pictures while in the ride chamber is also prohibited, even if the ride is stopped and your just walkign on the gondola.
-The Skeletens have always been there.
-The water is suppose to hit you per the sign posted outside the building.
-The pouches were changed in the middle of last season, the pouches zip shut and are slightly bigger.
Wait PKI stands for Paramounts Kings Island, i thought it was Public Key Infrastructure, im in the wrong place.
Just kidding.
However, on the other Kings Island site, that really did happen with soemone.
Heres some more abbreviations--
TR:TR- Tomb Raider: The Ride
WT:RA- Wild ThornBerrys River Adventure
TG-Top Gun
OC- Old Coney
AZ-Action Zone
AAA-Atom Ants Airways
Here is what a Huss Giant Delirium looks like http://www.hussrides.com/34GiantDelirium.htm
it has 3 gondolas, and the one shown on the webpage has water squirting up at it. Also I believe that this ride has a lower height requirment than the other Huss Giant rides.
Past ride: King Cobra
Major Flat Ride: Tomb Raider
Small Flat ride: Flying Eagles
Coaster: Beast
Water Ride: KCKC (defunct), WT:RA
Pay Ride: Days of Thunder
Kid Ride: Scooby Haunted Castle
I wouldn't really say Spongebob was horrible, I think it was actually funny. One thing about it though you couldnt really hear what spongebob was saying most of the time, but it was still cool
The park was good for a saturday. Hardly any wait for the coasters, Beast, Tomb Raider: The Ride, Flight of Fear, Spongebob, recaR, and Top Gun were all walk ons at the time we rode.
I suppose thats a good scroe, but judging by that score Im thinking the ride was slowed down for some reason makeing it possibel for you to get more target hits. I got a 3500+ but that was when it slowed down.
They actually do a pretty go job repairing the holes in FOFs line/ exit. it however does take at least 3 days for it to be properly fixied. (1-removal, resizing the hole to look good, and putting up the new dry wall, 2- putting "mud" on it so it blends in better, 3-painting)
Geesh Tom, good thing you got that out of your system before work on Friday.
And this is liek the 4th thread on this in the past 3 days, its getting old.