steveinphoenix Posted January 14, 2014 Posted January 14, 2014 I hope they get the last piece of the loop installed TODAY..... 3
Gplez90 Posted January 14, 2014 Posted January 14, 2014 Any guesses on what week track work will be done?
steveinphoenix Posted January 14, 2014 Posted January 14, 2014 I'm going to guess by the end of next week.
myklhicks Posted January 14, 2014 Posted January 14, 2014 "@KingsIslandPR: The roof for the station is now under construction on the new Banshee roller coaster at #KingsIsland. http://t.co/xiaqLE6AK3" 9
dwainw Posted January 14, 2014 Posted January 14, 2014 With 25 more track sections to go, and the last one arriving on sight tomorrow, I'm going to guess 2/6. Barring any long weather delays of course. 3
GamesAndRides Posted January 14, 2014 Posted January 14, 2014 Dont know If im right or wrong, But does it look like AE Sign Is Freshly Painted? 3
purdude86 Posted January 14, 2014 Posted January 14, 2014 It does look brighter and clearer than I remember it from earlier views. 3
steveinphoenix Posted January 14, 2014 Posted January 14, 2014 can anybody tell what they are working on right now?
upstop Posted January 14, 2014 Posted January 14, 2014 at the bottom of the original camera on the left hand side. there has been some serious digging going on there There used to be a bridge to the biergarten located there, and later on a RC boat game was there...Looks like the fence is gone, Good catch. 5
CoastersRZ Posted January 14, 2014 Posted January 14, 2014 That sign for Adventure Express was freshly painted for last season. It appears that they are working on the little dock area next to the lake that used to have the remote control boats on them. I wonder if they are going to be replacing the pavement and curbs in Action Zone and generally doing a sprucing up, much like they did with Rivertown in 2009. 4
dwainw Posted January 14, 2014 Posted January 14, 2014 ^^^They are rigging the top of the vertical loop just behind the batzel. Looks like the orange and yellow lift has also moved into place for the final lift of the loop. 1
GamesAndRides Posted January 14, 2014 Posted January 14, 2014 Alright, So Diamondback`s Last Piece of track was Jan 26th. Do you think Banshee Can beat that? 4
calakapepe Posted January 14, 2014 Posted January 14, 2014 I wonder what it looks like from Adventure Express now..Also, I looked back at the cam pictures from awhile ago and the Adventure Express sign looks just as "fresh" as it does in your above photo. However, the fence by the pond is definitely gone lol 5
upstop Posted January 14, 2014 Posted January 14, 2014 It looks like they are taking pavers out....might just be taking the path out because it leads to a dead end with out the bridge. 2
coasterfanatic83 Posted January 14, 2014 Posted January 14, 2014 "While the construction of Banshee heads down the stretch, the park is preparing for the arrival of the trains. The trains are coming from Switzerland, and they could be on property by the end of the month." https://www.visitkingsisland.com/Banshee/the-evidence/wail-of-the-Banshee-blog/blog-article/Banshee-construction-heading-down-the-stretch 11
Oldschool75 Posted January 14, 2014 Posted January 14, 2014 J New for 2014: Free swimming lessons in the Oktoberfest pond! Going by past events; I'll skip the swim lessons. 18
Gplez90 Posted January 14, 2014 Posted January 14, 2014 The trains are due to arrive later this month!! 7
Tuskin Posted January 14, 2014 Posted January 14, 2014 Final piece of the last loop being installed as we speak. Edit - I somehow missed Upstop's post. 3
Kat Posted January 14, 2014 Posted January 14, 2014 on my lunch break at work and just had to get on to view the camera.... haven't viewed it in so long.... man, that is one beautiful massive coaster!!! I can't wait!! final vertical loop is complete now I'm so excited to ride this coaster. Opening day 2014 needs to hurry up!!! 4
Coasterama Posted January 14, 2014 Posted January 14, 2014 It looks like the On Location sign has been removed. Most likely getting renamed. EDIT: Never Mind, just a shadow. 2
flightoffear1996 Posted January 14, 2014 Posted January 14, 2014 From the looks of the ride so far it looks the brakes at the end will be on hard for sure. 2
steveinphoenix Posted January 14, 2014 Posted January 14, 2014 Looks like the A-frame roof of the station is coming along nicely. 2
LoraX Posted January 14, 2014 Posted January 14, 2014 That looks amazing. I think this is going to be even better than I imagined from the announcement. The video looked amazing. Hearing the stats sounded amazing. Seeing it though - WOW! Sent from my iPhone using Tapatalk 3
davidw Posted January 14, 2014 Posted January 14, 2014 One support and two pieces of track installed today. Link to gallery 12
steveinphoenix Posted January 14, 2014 Posted January 14, 2014 I am going to guess 3/3 for tomorrow. 3 supports and 3 pieces of track. 3
myklhicks Posted January 14, 2014 Posted January 14, 2014 For those of you not on Instagram, Kings Island posted three photos today, one of the Banshee station, one of the loop (not topped off), and one of them digging. Here's the photo of the station so far: 20
Gplez90 Posted January 14, 2014 Posted January 14, 2014 The station is going to look great! In one of the pictures it appears as if they're doing more landscaping under the low passing areas. 5
Recommended Posts