silver2005 Posted February 12, 2014 Share Posted February 12, 2014 I wonder what that random wall by the stairs will be for... 1 Link to comment Share on other sites More sharing options...
pyrocoasterkid Posted February 12, 2014 Share Posted February 12, 2014 I find it interesting that the trains sit on the wheels in the storage shed. Doesn't B&M have a different set of wheels for the train to sit on in the storage shed on other their other types of coasters (see Diamondback)? When Diamondback was built, it was mentioned that it was done to prevent flat spot/lumps in the wheels from sitting in one spot each night, thus causing a bumpier ride and necessitating wheel changes more often. Not that I don't trust B&M, but what makes an inverted train and its wheels different than their other types of rides? *Edit*I just realized that those are actually a different set of wheels, and not the running wheels. My bad, it's early in the morning! Link to comment Share on other sites More sharing options...
thegajone Posted February 12, 2014 Share Posted February 12, 2014 ^^They already said they wouldnt...you missed an old memo mate . Btw some die hard enthusiasts are driving me insane.. They see one car on the train and immediately think OMG testing soon...le sigh..we got lot more to do first Ok, so for us who are ignorant to the process, what kind of time frame can we expect there to be before they start testing? 1 Link to comment Share on other sites More sharing options...
UnrealNightmare Posted February 12, 2014 Share Posted February 12, 2014 ^^Maint & stuff will go first, but ride ops getting to the ride early April for training & stuff. One guy I saw got Banshee's crew is going in I think it was 06APR. I'd have to check FB but I can't atm to get when he was inprocessing. Few people have gotten their ride placement emails for returners. One person on Eiffel Tower got her placement already Lindz said. Few other returners still waiting. I just made the point because them getting their positions probably plays little to no role in when the initial testing begins. 5 Link to comment Share on other sites More sharing options...
RollerNut Posted February 12, 2014 Share Posted February 12, 2014 http://rcdb.com/2536.htm?p=11181 I find it interesting that the trains sit on the wheels in the storage shed. Doesn't B&M have a different set of wheels for the train to sit on in the storage shed on other their other types of coasters (see Diamondback)? When Diamondback was built, it was mentioned that it was done to prevent flat spot/lumps in the wheels from sitting in one spot each night, thus causing a bumpier ride and necessitating wheel changes more often. Not that I don't trust B&M, but what makes an inverted train and its wheels different than their other types of rides? *Edit* I just realized that those are actually a different set of wheels, and not the running wheels. My bad, it's early in the morning! I am pretty sure that the running wheels are clear of the rails and that the cars actuallyhang on the set of wheels just above the riders heads that sit on the catwalks. Link to comment Share on other sites More sharing options...
calakapepe Posted February 12, 2014 Share Posted February 12, 2014 Indeed, though. Going from the renderings, it looks like the trains will have tacky looking wheels just floating on the side, or the crews will have to put on the side covers that are featured in the renderings. 1 Link to comment Share on other sites More sharing options...
pyrocoasterkid Posted February 12, 2014 Share Posted February 12, 2014 http://rcdb.com/2536.htm?p=11181 I find it interesting that the trains sit on the wheels in the storage shed. Doesn't B&M have a different set of wheels for the train to sit on in the storage shed on other their other types of coasters (see Diamondback)? When Diamondback was built, it was mentioned that it was done to prevent flat spot/lumps in the wheels from sitting in one spot each night, thus causing a bumpier ride and necessitating wheel changes more often. Not that I don't trust B&M, but what makes an inverted train and its wheels different than their other types of rides? *Edit* I just realized that those are actually a different set of wheels, and not the running wheels. My bad, it's early in the morning! I am pretty sure that the running wheels are clear of the rails and that the cars actuallyhang on the set of wheels just above the riders heads that sit on the catwalks. Indeed, though. Going from the renderings, it looks like the trains will have tacky looking wheels just floating on the side, or the crews will have to put on the side covers that are featured in the renderings. You both are correct. I realized it just after I posted and immediately edited my post. You can see the ride wheels in the picture of the original train delivery, and they are clearly different than the wheels that it sits on in the storage shed. It also does appear the wheel covers will cover the "storage shed wheels." Having said that, it seems kind of odd/inefficient that they have to remove and put those on each day. Maybe it's just me. I'm sure it's the same way on at least all newer inverts...just not something I thought of I guess. 1 Link to comment Share on other sites More sharing options...
AZ Kinda Guy Posted February 12, 2014 Share Posted February 12, 2014 I just made the point because them getting their positions probably plays little to no role in when the initial testing begins. You are correct. Operations are generally at the end of the line when it comes to whats important out in the field when a new coaster is being built. Link to comment Share on other sites More sharing options...
thedevariouseffect Posted February 12, 2014 Share Posted February 12, 2014 I even stated that..First five words..But apparently crews are arriving early APR for training, so I'm assuming right before then Maint & supervision will get it going. Link to comment Share on other sites More sharing options...
UnrealNightmare Posted February 12, 2014 Share Posted February 12, 2014 Yes but in your initial post you made it seem as if they needed to be placed before the ride began testing. They haven't even placed all ride op positions yet, only a few people have gotten their emails so far Link to comment Share on other sites More sharing options...
thedevariouseffect Posted February 12, 2014 Share Posted February 12, 2014 Oh yeah no...Lol lets send ride ops there when they haven't even finished building the station, electrical, etc. lol Hell no.. We don't even have all three trains to get it going and testing yet, just one car so far, whole train isn't even put together yet Link to comment Share on other sites More sharing options...
steveinphoenix Posted February 12, 2014 Share Posted February 12, 2014 If I am not mistaken, when they do first start testing. The very first run is done with ropes and cables and pulleys. They pull the train all the way through the track that way first to make sure there are no "hang ups". And if that goes well, then they start running the cars through normally. I could be wrong. But I think that's probably how they will do it. Link to comment Share on other sites More sharing options...
davidw Posted February 12, 2014 Share Posted February 12, 2014 From @KingsIslandPR. "The container with the second train for the new Banshee roller coaster is on its way to the park. #KIBanshee" https://twitter.com/KingsIslandPR/status/433646140374802432 5 Link to comment Share on other sites More sharing options...
RailRider Posted February 12, 2014 Share Posted February 12, 2014 Speaking of containers shipping trains. What do you think the shipping bill is on the trains? Something interesting to think about. 10 Link to comment Share on other sites More sharing options...
pbkigi Posted February 12, 2014 Share Posted February 12, 2014 ^10 grand for each train. Link to comment Share on other sites More sharing options...
Gabe Posted February 12, 2014 Share Posted February 12, 2014 I wonder if the video playing in the que line will be the work of Ryan, ala Diamondback? Link to comment Share on other sites More sharing options...
calakapepe Posted February 12, 2014 Share Posted February 12, 2014 I doubt they'd do a pull through for this ride. Honestly, there are easier, cheaper, and faster ways to get those checks done. The last ride I personally remember having a pull through with the actual train was Maverick. Different company, different ride, different time. 3 Link to comment Share on other sites More sharing options...
GamesAndRides Posted February 12, 2014 Share Posted February 12, 2014 If I am not mistaken, when they do first start testing. The very first run is done with ropes and cables and pulleys. They pull the train all the way through the track that way first to make sure there are no "hang ups". And if that goes well, then they start running the cars through normally. I could be wrong. But I think that's probably how they will do it. I dont think they will do that. I dont think they ever do it on an Invert Let Alone Any looping Coaster. That Just be to hard to pull through the track. I know they did the pull through on the Seven Dwarfs Mine Train Over at Magic Kingdom. I may be wrong, But I Think Once All The Trains Were On Diamondback`s Track, They Started Testing. 2 Link to comment Share on other sites More sharing options...
dwainw Posted February 12, 2014 Share Posted February 12, 2014 Skyrush had a pull-through just a couple years ago. But B&Ms don't seem to require them anymore. 3 Link to comment Share on other sites More sharing options...
davidw Posted February 12, 2014 Share Posted February 12, 2014 they do this instead of pulling a train through https://www.facebook.com/cprundown/photos/552443688182074 7 Link to comment Share on other sites More sharing options...
Nick_Plummer Posted February 12, 2014 Share Posted February 12, 2014 I wonder what that random wall by the stairs will be for... I believe it is a place to view your photos when you get off. Link to comment Share on other sites More sharing options...
calakapepe Posted February 12, 2014 Share Posted February 12, 2014 ^ That's what I was expecting, but there's no evidence to suggest that, that I've seen.Although, I'd imagine doing that would create a little congestion on the stairway down, so maybe the wall can only be a decorative architecture.Kinda how it suggests the steeple portion of a church without building an extra section of building. 2 Link to comment Share on other sites More sharing options...
steveinphoenix Posted February 12, 2014 Share Posted February 12, 2014 Have they even built that wall yet? Link to comment Share on other sites More sharing options...
THE_BEASTmaster Posted February 12, 2014 Share Posted February 12, 2014 I wonder what that random wall by the stairs will be for... I believe it is a place to view your photos when you get off. I think the on ride photo booth will be under the station along with the gift shop. As someone said earlier, the wall could just hide the maintenance shed behind Banshee. 3 Link to comment Share on other sites More sharing options...
TheBeast1116 Posted February 12, 2014 Share Posted February 12, 2014 Good point. I mean everyone will be just standing their in the way of other people who don't want a ride photo, 2 Link to comment Share on other sites More sharing options...
Colonel_SoB_fan Posted February 12, 2014 Share Posted February 12, 2014 Remember the wall may never be built as the renderings are not final Sent from my SAMSUNG-SGH-I547 using Tapatalk Link to comment Share on other sites More sharing options...
TTD-120-420 Posted February 12, 2014 Share Posted February 12, 2014 Speaking of containers shipping trains. What do you think the shipping bill is on the trains? Something interesting to think about. I've always wondered how the $20+ Million is spread out. How much of that goes to B&M? To ADENA? To the steel manufacturing plant? To shipping? To the design firm of the station, etc...? Always thought it would be cool to see that layed out on a piechart. 6 Link to comment Share on other sites More sharing options...
Gplez90 Posted February 12, 2014 Share Posted February 12, 2014 The station is really coming along nicely!Image can be found on Kings Islands Twitter page Sent from my iPad using Tapatalk 11 Link to comment Share on other sites More sharing options...
Coasterama Posted February 12, 2014 Share Posted February 12, 2014 ^ That picture is taken in the backside of the station, and the entrance stairs are coming up from the back. If my hypothesis is correct, you will enter the station by going around to the back of the station, allowing for a great view of the back half of the ride. Looks like we'll have even more to look at while waiting in line. 4 Link to comment Share on other sites More sharing options...
PKIVortex Posted February 12, 2014 Share Posted February 12, 2014 So one set of stairs for the main line and a set of stairs for Fast Lane is what it looks like to me? Am I correct? 4 Link to comment Share on other sites More sharing options...