SonODiamondback Posted August 8, 2016 Share Posted August 8, 2016 BTW I didn't get any pictures of it today. But the retaining wall looks like it won't block the veiw of the reservoir witch is what I was hoping. I wish I could have gotten back on the WWC path today but it was closed till 4:00. Sent from my SM-G900V using Tapatalk 4 Link to comment Share on other sites More sharing options...
WWC2003Amy Posted August 8, 2016 Share Posted August 8, 2016 I was honestly expecting the Diamondback webcam to serve as our construction cam this year. I think the last time a webcam for construction wasn't on the tower (waterpark addition aside) was WindSeeker I Believe Banshee had a construction cam that was not on the tower. Sent from my iPhone using Tapatalk 1 Link to comment Share on other sites More sharing options...
SonODiamondback Posted August 8, 2016 Share Posted August 8, 2016 The DB cam Realy doesn't give you a good view. I think one on the big tan box would be a great shot. Sent from my SM-G900V using Tapatalk 4 Link to comment Share on other sites More sharing options...
CoasterOhio Posted August 8, 2016 Share Posted August 8, 2016 I was honestly expecting the Diamondback webcam to serve as our construction cam this year. I think the last time a webcam for construction wasn't on the tower (waterpark addition aside) was WindSeeker Woodstock Gliders would disagree. Also. I never said the camera was on yet. All I said is that there is a camera on The Crypt building. 3 Link to comment Share on other sites More sharing options...
calakapepe Posted August 8, 2016 Share Posted August 8, 2016 *struggles to remember that but didnt pay much attention to that year's construction off season so will take your word for it* 2 Link to comment Share on other sites More sharing options...
CoasterOhio Posted August 9, 2016 Share Posted August 9, 2016 Banshee had a separate camera aimed at the back half of the ride. Woodstock Gliders & Buggies had their own camera during construction. (Live-still from the Woodstock construction camera) 5 Link to comment Share on other sites More sharing options...
Fubar Posted August 9, 2016 Share Posted August 9, 2016 I am so excited for Mystic Timbers. Kings Island is my second home park. My wife and I discussed this while on a trip to Carowinds. We are so blessed to have Cedar Point as our home park and have the beautiful Kings Island only 3.5 hours away. Sent from my SM-G935V using Tapatalk 8 Link to comment Share on other sites More sharing options...
Magenta Lizard Posted August 9, 2016 Share Posted August 9, 2016 They've continued trenching and pouring around the corner. These appeared to be some sort of concrete poured in frames but I'm not certain. These metal pieces look like they may be pouring forms, but I'm not sure about that either. It was soooo tempting to pull off one of these material description stickers, but I resisted. There were three or four, and the top one was dirty and rubbed off in places so my hand is in the pic so I could show a cleaner one. The things in the box were rebar pieces. 12 Link to comment Share on other sites More sharing options...
CP Maverick Posted August 9, 2016 Share Posted August 9, 2016 Those are definitely forms for the footers. They are going to need a few of those. 5 Link to comment Share on other sites More sharing options...
DontWantToWait42mar0 Posted August 10, 2016 Share Posted August 10, 2016 ^^ You wanted to take a description sticker from the rebar? That's not being an enthusiast, that's something else. 6 Link to comment Share on other sites More sharing options...
Magenta Lizard Posted August 10, 2016 Share Posted August 10, 2016 Oh, are you still around? 17 Link to comment Share on other sites More sharing options...
Rockfrog33 Posted August 10, 2016 Share Posted August 10, 2016 Looks like more concrete work was done today. 2 Link to comment Share on other sites More sharing options...
Shawn Meyer Posted August 10, 2016 Share Posted August 10, 2016 ^ Are you referring to the footers? I know dumb question. 1 Link to comment Share on other sites More sharing options...
MDMC01 Posted August 10, 2016 Share Posted August 10, 2016 I saw lots and lots of rebar today whlle riding the train. I also got to see where the hillside was being cleared out for what I'm presuming is the turnaround. 6 Link to comment Share on other sites More sharing options...
scottwoods42 Posted August 11, 2016 Share Posted August 11, 2016 Sent from my SM-N920P using Tapatalk 12 Link to comment Share on other sites More sharing options...
RollerNut Posted August 11, 2016 Share Posted August 11, 2016 I wonder if they will start here with vertical construction too? 2 Link to comment Share on other sites More sharing options...
CoasterOhio Posted August 11, 2016 Share Posted August 11, 2016 More than likely. Looks like they're starting with section 1b first. 2 Link to comment Share on other sites More sharing options...
sikkinixx99 Posted August 11, 2016 Share Posted August 11, 2016 Out of curiosity how many Footers to construct The Beast? I Googled it all I can find is how many for SOB on its Wikipedia page. Which was 2,414 footers at 11 feet deep. Wonder how many for Mystic Timbers? 2 Link to comment Share on other sites More sharing options...
IBEW_Sparky Posted August 11, 2016 Share Posted August 11, 2016 Im betting if someone were to ask Don kindly for that information, he could include that in one of the facts of the ride, along with maybe how many board feet of lumber used, etc. 8 Link to comment Share on other sites More sharing options...
SonODiamondback Posted August 11, 2016 Share Posted August 11, 2016 I'm going to take a wild guess and say 1100 Sent from my SM-G900V using Tapatalk 2 Link to comment Share on other sites More sharing options...
MysticsTimber Posted August 12, 2016 Share Posted August 12, 2016 Got a nice panoramic view of the footers for Mystic Timbers. Edit: Apparently I can't spell Timbers lol (fixed) Sent from my iPhone using Tapatalk 13 Link to comment Share on other sites More sharing options...
RollerNut Posted August 12, 2016 Share Posted August 12, 2016 Wow, they are highballing along! 2 Link to comment Share on other sites More sharing options...
DubVLegend Posted August 12, 2016 Share Posted August 12, 2016 It looks like the same footers for Mystic Timbers. Good picture! Sent from Me using Tapatalk 4 Link to comment Share on other sites More sharing options...
MysticsTimber Posted August 12, 2016 Share Posted August 12, 2016 It looks like the same footers for Mystic Timbers. Good picture! Sent from Me using Tapatalk I see where you went with that It has been fixed, and thank you!Sent from my iPhone using Tapatalk 4 Link to comment Share on other sites More sharing options...
Shawn Meyer Posted August 12, 2016 Share Posted August 12, 2016 This is a dumb question, but are they done with falling trees? :hint hint: 3 Link to comment Share on other sites More sharing options...
calakapepe Posted August 12, 2016 Share Posted August 12, 2016 Judging by the trees next to the WWC blasting stations.. I'd guess they are not quite done yet. 3 Link to comment Share on other sites More sharing options...
Magenta Lizard Posted August 12, 2016 Share Posted August 12, 2016 We won't be able to get these nice close pics of the work area soon, as they are itching to close WWC to get to work on the crossings. I think the ride would already be closed if it hadn't been so absurdly hot these last couple of weeks. My past few visits, WWC has been closed until later in the day, because they had the fences down to bring in mixer trucks*, etc. We will apparently still be able to take pics from the train, during the /days/ in the fall anyway (I asked Don Helbig specifically if they'd be running during Haunt, and he said they wouldn't, only days). It isn't quite the same tho. But we can see other areas from the train we can't see from WWC queue. The retaining wall has been completed. I couldn't see these really well, but they seem to be stacked trusses. Station maybe? * I've heard in the past that mixer truck drivers can sometimes be a little nuts, trying to get the concrete to their worksite before it sets. When I was riding the train yesterday, as I was focused on taking shots of what had been poured already, I heard an unexpected blast of the train whistle. I looked forward, surprised, and saw a mixer truck driving rapidly into the job site to my right. He apparently just drove across the tracks in front of the train and I don't think the engineer was very pleased. I don't think it was close to an accident or anything tho. 13 Link to comment Share on other sites More sharing options...
medford Posted August 12, 2016 Share Posted August 12, 2016 I saw the process that they have to go thru on that Mike Rowe show (dirty jobs, or tough jobs, whatever it was called, can't recall exactly). Basically have to set off explosives to get it apart then chisle away the rest. I'm sure those truck drivers are instructed not to waste time. IIRC, they have roughly an hour from when they leave the plant to when they have to get the cement poured. With that said, no way they are as crazy as steel workers. I've seen those guys putting up structure for both buildings and roller coasters, there is not enough money in the world to get me to do the job those people do. 5 Link to comment Share on other sites More sharing options...
FoolCrzy Posted August 12, 2016 Share Posted August 12, 2016 I saw the process that they have to go thru on that Mike Rowe show (dirty jobs, or tough jobs, whatever it was called, can't recall exactly). Basically have to set off explosives to get it apart then chisle away the rest. I'm sure those truck drivers are instructed not to waste time. IIRC, they have roughly an hour from when they leave the plant to when they have to get the cement poured. With that said, no way they are as crazy as steel workers. I've seen those guys putting up structure for both buildings and roller coasters, there is not enough money in the world to get me to do the job those people do. I believe you mean Ironworker.. But yes. Crazy!!! Back to the Concrete trucks. Yes there is a finite amount of time to get the product poured. Temp, humidity and the specific mix are all variables. They definitely need to hustle to the site. 3 Link to comment Share on other sites More sharing options...
Magenta Lizard Posted August 12, 2016 Share Posted August 12, 2016 As expected: To accommodate the construction of #MysticTimbers, White Water Canyon will close after Sunday for the season. https://twitter.com/kingsislandpr/status/764121030407426056 6 Link to comment Share on other sites More sharing options...