I wonder where those trains will go. It'd be neat if they put them on Corkscrew, as Corkscrew's current trains can be suuper cramped for some. Probably won't happen though.

 

 

 

(It would've been great to keep at least the front car of one of the trains in the park. Have it placed in a store or some good location so that people can get in it and take pictures, like the Gemini car in Cedar Point's museum.)

  • Like 3
Link to comment
Share on other sites

  On 12/6/2019 at 7:22 PM, TheFloppyDisc said:

I believe the picture @freaks76 is talking about is this which I saw on reddit (u/mateo8165) and It was also on the Kings Island Season Pass Holders Facebook group.

o94hsn01v1341.jpg

 

Expand  

I wonder if it would be legal to sit in one of the cars while riding down the highway. They do have restraints, no?

  • Like 3
  • Haha 4
Link to comment
Share on other sites

It's almost like organ donation...lol. Nice to see some of it live on. I wonder if they've ever thought about auctioning off pieces of the ride. Is that a thing? It'd be cool to have a 2-3' section of Vortex down in the basement for memory's sake. I think I could out-bid scrap prices to make it worth their time. Anyone else?

  • Like 3
Link to comment
Share on other sites

  On 12/7/2019 at 2:31 AM, bjcolglazier said:

It's almost like organ donation...lol. Nice to see some of it live on. I wonder if they've ever thought about auctioning off pieces of the ride. Is that a thing? It'd be cool to have a 2-3' section of Vortex down in the basement for memory's sake. I think I could out-bid scrap prices to make it worth their time. Anyone else?

Expand  

I'd love to have a piece of track as a makeshift club for my car. Imagine beating some mugger into submission with The Vortex.

  • Haha 4
Link to comment
Share on other sites

Which track piece(s) have they removed so far?

Though it would be sad for some, I feel like a reverse construction "map" (like what was done for Banshee's construction, highlighting which pieces and supports have been added) should be made for Vortex's demo showing which pieces have been removed.

  • Like 1
Link to comment
Share on other sites

  On 12/15/2019 at 1:58 PM, MDMC01 said:

Which track piece(s) have they removed so far?

Though it would be sad for some, I feel like a reverse construction "map" (like what was done for Banshee's construction, highlighting which pieces and supports have been added) should be made for Vortex's demo showing which pieces have been removed.

Expand  

Banshee took several months to build.  My guess is that Vortex isn't being dismantled piece by piece.  Demo will take a few days, maybe less...

 

And with any luck, since that land is apparently sinking- once the coaster falls to the ground it could get swallowed up and they wouldn't have to worry about hauling it away.

  • Like 2
  • Haha 2
Link to comment
Share on other sites

I have two theories about why this part of the track was removed:

1.  This is normal to prevent any trains from being dispatched.  Yes, I know, I know.

2.  The remove track that connects to the station so when they start major demolition, it will not be connected to the station, which will not damage the station because it's staying.  One can hope, right?

  • Like 5
Link to comment
Share on other sites

It could also be as simple as them sending a piece of track to a museum before a certain date.

 

Or, since they removed the lift gear for reuse, it may have been easier to just cut off the rails at the bottom of the lift.

  • Like 2
Link to comment
Share on other sites

  On 12/7/2019 at 2:31 AM, bjcolglazier said:

It's almost like organ donation...lol. Nice to see some of it live on. I wonder if they've ever thought about auctioning off pieces of the ride. Is that a thing? It'd be cool to have a 2-3' section of Vortex down in the basement for memory's sake. I think I could out-bid scrap prices to make it worth their time. Anyone else?

Expand  

I wish Kings Island could auction off the front car of Vortex like Knotts did with Boomerangs front car.

 

  • Like 2
Link to comment
Share on other sites

  On 12/15/2019 at 2:24 PM, Outdoor Man said:

Banshee took several months to build.  My guess is that Vortex isn't being dismantled piece by piece.  Demo will take a few days, maybe less...

 

And with any luck, since that land is apparently sinking- once the coaster falls to the ground it could get swallowed up and they wouldn't have to worry about hauling it away.

Expand  

I think it will take a bit longer than a few days. It's not as simple as bringing in a wrecking ball and going to town. They started taking down SoB sometime in August/September and I remember the lift hill didn't come down until the week of Thanksgiving. 

  • Like 3
Link to comment
Share on other sites

  On 12/15/2019 at 4:30 PM, KI FANATIC 37 said:

I think it will take a bit longer than a few days. It's not as simple as bringing in a wrecking ball and going to town. They started taking down SoB sometime in August/September and I remember the lift hill didn't come down until the week of Thanksgiving. 

Expand  

Son of Beast was also in a significantly more accessible location without as much risk for collateral damage should demolition go wrong. (The Beast's station)

  • Like 2
Link to comment