super7
Members-
Posts
663 -
Joined
-
Last visited
-
Days Won
12
Content Type
Profiles
Forums
Calendar
Everything posted by super7
-
What the ride needs is an extended final lift hill, followed by a Carowinds Goldrusher type final helix/tunnel finale or a Silver Dollar City Thunderation swooping five finale. Both are excellent mine train finales. Plus rethemed to Barvaria.
-
The event should run 6 hours minimum
-
I found this fall when a certain supervisor was working at The Beast, there was no stacking and the line continuously was moving.
-
In ‘17 the lines were short on regular weekend Fridays and Sundays. Especially later at night. But this summer the park seemed more crowded so that may be different this year.
-
Carowinds is running three coasters this year. Kings Dominion is running 2. KD competes directly with Busch so they are probably matching them. I agree Racer is a great flexible capacity coaster for an event like this It needs work do hopefully that’s what they are doing with it on the off season Its surprising KI is only running one with its normally higher attendance than those parks but maybe they are trying to see what cost cutting they can get away with without affecting attendance (like closing Vortex without direct replacement) But in all fairness KI operates the popular railroad fir this event and the other parks removed that great ride decades ago. Steam trains are expensive to run and personally I would rather see a Christmas train than a coaster.
-
They had the light forms up last weekend and the train was operating. They end at the water park this year.
-
I’m guessing the ice rink will be solid ice like Kings Dominion.
-
The 12 days of Christmas lights ran through the entire ride previous years. The 12 drummers used to be right before the Rivertown station. This year the 12 drummers are at the water park station. Maybe lights on the second half of the ride?
-
I’ll wait to see what else they do before making a full decision, but the lights on the small maple trees are going to be underwhelming compared to the previous trees and super underwhelming compared to Kings Dominion’s and Wonderland’s canopies of trees. And tree lighting is more immersive than stringing lights from buildings to poles Are they doing something new on the 2nd half of the train ride? The 12 days of Christmas ends at the water park station this year
-
Discussing Land and Space in and around Vortex
super7 replied to Klabergian Empire's topic in Kings Island
That seems to be the direction the park has went. Cut down trees instead of working around them (the land clearing for Diamondback and Orion instead of building the coaster through the trees like The Beast). Also the tree removal around The Beast the last couple years ( around the station, between the first tunnel and the brake run, and between the brake run and the long 2nd tunnel). Any bad tree is now cut down and not replaced with the exception of the new trees on I-Street. Overall, the park is VERY hot when the weather is hot, as there is little shade now on the walkways. -
Hopefully this ride gets the lift hill system that Racer 75 at Kings Dominion got fir 2019. As long as the trains are released within something like 30 seconds of each other, The lift hill synchronize them so they go over the top at the same time.
-
A Huss Magic does that and is a superior ride with gondolas that are under the arms and 4 wide seating. The Schwarzkopf monsters also load all at once.
-
My first choice is remove it, build a lake with a hydro flume over it lol 2nd choice, Build a mountain facade and install a high quality dark ride like Calico Mine Train at Knotts.
-
Thank goodness this didn’t happen. It would have been worse than Paramount. Six flags parks are dirty, poorly operated, poor customer relations, poorly landscaped and little live entertainment or theming other than cheesy superheroes. Cedar Fair is currently doing an amazing job with the Taft parks. I would not have renewed my pass if Six Flags was the owner.
-
Discussing Land and Space in and around Vortex
super7 replied to Klabergian Empire's topic in Kings Island
I Agree! That’s the biggest disappointment of Orion. They built it too close to The Beast and removed too many trees around that coaster. In addition to the other trees removed after the first tunnel and before the first tunnel, will The Beast eventually become as treeless as the rest of the park? The love cutting down trees but not planting them! -
It’s a horrible, rough coaster with some of the worst transitions in the business. One could visually see how bad the transitions are. It’s not a great loss and there are a lot better coasters that will fill that space
-
Looks like there is only one roller coaster at Kings Island for Winterfest while the other Cedar Fair parks are getting at least two except for Canada‘s Wonderland. But on the flipside Kings Island does have an expensive train to operate While the other parks do not except for worlds of fun
-
There are some major trees around the train. It would look amazing if there were lights in them. It would also be labor-intensive to do that
-
I’m not a fan of any Christmas lights on metal frames in general. I prefer them on trees shrubs or buildings.
-
Tinseltown That’s an area that can get stronger with more 50s 60s style decorations. Placing The Mistletones in that area was a great move last year.
-
The Blue Ridge Tollway runs atKings Dominion Winterfest. Since part of the damage the Paramount did to that park was removing the train, the antique cars there are the 12 days of Christmas ride It would be nice if they would refresh some of the less produced shows like The Mistletones, Jingle Jazz, Sounds of the Nativity with new songs.
-
My guess is the programmer(s) of the finale maybe has(have) technical lighting knowledge but not musical knowledge The two songs of the finale are strong dance beat songs that would allow for a lot of choreographed synchronization. The Pigeon Forge show is a good example of syncing to the music
-
I previously was lambasted on this board fior criticizing the programming of the fountains. It was probably by whoever programmed them lol. But the fountains have nearly no synchronization to the music during the finale, and none during gvthe day. Sure they change colors and patterns during the finale, but it’s not the high level of synchronization that is possible They have SO much potential, but it will take someone that knows music phrasing and counts to program them to do that.
-
What the park needs: 1. TREES. As the park ages, they keep cutting down trees with no replacement. It's becoming pretty miserable in the heat. 2. Investment in true family rides (dark rides, skyway, etc). Rides that everyone can ride together no matter age, height, weight, etc. THIS is why Disney is so well attended, and all the rest of the theme parks are missing out on this market. Bringing back the Antique Cars was a very wise step in this direction. 3. Oktoberfest renovation and flat ride package 4. Action Zone retheming (Transylvania). With this a world-class dark ride like the Phantom Theatre once was.
-
Kings Dominion had the same coaster until 83. They used the standard Galaxi name for it. There was a fatality on it in 83. I believe a kid riding alone hit his head. The ride didn’t have much excess clearance and I have seen statements that he may have stood up. These were SDC rides. They had 2 car trains. Schwarzkopf Wildcats use individual cars. The Galaxii has 2 helixes and then a swerve around the lift hill, another turn then brakes. The Wildcats have two helixes then straight into the brakes out of the second helix. It’s a jolting stop on the wildcats.