8 minutes ago, emp41112 said:

Hard to tell if its track or something else here

image.png

I think they may be putting the pre lift track piece in. Seems to be the one with the wheels and the beginning of the chain.

  • Like 2
Posted
6 minutes ago, IndyGuy4KI said:

This thread has been cleaned up. Please stay on topic and take any personal matters into a PM amongst yourselves. Thanks!

You missed some, and removed some that werent supposed to be removed, and on topic. Smh

 

You should have moved it to an off-topic thread so everyone knows about the plagiarism. I'm moving the screenshots I took of this thread to a folder to save them for later. 

  • Like 1
Posted
4 minutes ago, CedarIslander said:

I've got 4 monitors at work. And one is dedicated to the construction cam, despite the annoyance from my boss! So exciting!

I have three, but I have the construction cam maximized at all times on the biggest of the 3.

 

Here it goes!  They have the backbone angled down to the footer!  Yesssss

  • Like 4
Posted
LIFT HILL LETS GOOOOO.
Ill update the color track diagram accordingly tonight! 
Cant wait to see how many pieces go up. Without Clifford on sight I only imagine one strait section going up. 


I’d say as many as they can till they hit max height/capacity on the crane. It will all depend upon how fast the lift hill gains altitude.
Posted
21 minutes ago, JonahWilliamson said:

LIFT HILL LETS GOOOOO.

Ill update the color track diagram accordingly tonight! 
Cant wait to see how many pieces go up. Without Clifford on sight I only imagine one strait section going up. 

They will need at least 2 more cranes on site.  Watched the erection of copperhead the other day and they had at least 4 cranes in that congested area

  • Like 3
Posted
1 minute ago, Maverick44 said:

So it looks like that piece doesn't meet the station track. Is there a piece that will go between? Looks like a small gap.

I don't believe that piece is actually in place yet.  According to the blueprint, that piece currently being installed should attach to the piece that was installed earlier this morning.

  • Like 2
Posted
1 minute ago, LovinMeSomeBanshee said:

I don't believe that piece is actually in place yet.  

good call lol I think now that I look super close. You are right.

@thatguyfromohio no there is track on that piece. You could see it when it was on the truck.

Posted
3 minutes ago, thatguyfromohio said:

That piece is just a support, a track section will connect the station tracking to the bone support


Sent from my iPhone using Tapatalk

It's actually a large chunk of backbone with a small elbow-shaped piece of track attached that begins the lift hill.

This is (very roughly) what the piece looks like that is being installed.

Untitled.png

  • Like 5
Posted
Just now, CedarIslander said:

I'm surprised they started on the base of the lift hill before doing the brake run. But I'll take it!

It kinds makes sense considering most of the pieces there are pretty much where the brake run would be.

  • Like 1