Skip to content
View in the app

A better way to browse. Learn more.

Kings Island Central Forums

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

Mystic Timbers Construction Progress

Featured Replies

Watching the workers climbing around up top doing the connecting makes me feel like they're a little crazy, but I'm also insanely jealous. If I could have physically managed such a job it would be my dream!

  • Replies 2.7k
  • Views 557.5k
  • Created
  • Last Reply

Top Posters In This Topic

Most Popular Posts

Posted Images

I would guess tht the tallest point of the lift hill should now be visible, directly under Diamondback's second hill, from Kings Island Dr. or surrounding roads. The ride isn't very tall, but the peak at 109 ft should be somewhat visible, I would assume.

Can anyone in the area confirm?

I work on Innovation Way.  I think I can see it from one of the windows, but I can't go into the office that has the only view without a tree through it, otherwise I would take a picture.

If the drop will be like every other GCI curved drop, we aren't done going higher quite yet.

^They look to be close now.  The supports look to be arcing towards where the lift crests.  There has to be some un-banked track on the downward track opposite of the lift ascent to house the chain drive gear at the top.  I'd estimate there are only about 1 or 2 more supports to go before the top is reached. 

^They look to be close now.  The supports look to be arcing towards where the lift crests.  There has to be some un-banked track on the downward track opposite of the lift ascent to house the chain drive gear at the top.  I'd estimate there are only about 1 or 2 more supports to go before the top is reached. 

i was thinking the same thing, or we would be able to tell for sure once that current bent was up. But they still have the second half of it to go.

Can I get in line now?  :P

This will be my first GCI and I have always admired Thunderhead. My brother said TH is really good, so I am expecting the same from Mystic Timbers.

133aed9d2f.jpg

 

 

 Count each "square" as 6 feet from the bottom going up to the top and I would say the hill is at the apex right about now.(just over 100 feet) I believe the workers could stand up inside a square when they were working on the framing so that's how I came up with approximately 6 feet per square. Looking good!

Just passed by KI on the way to CP (not going to have much time there tonight, but we'll be there all day tomorrow and part of Sunday) and I'm surprised at how much of MT is visible above the treeline from the freeway. I was expecting just a few feet to be above, but it's actually more like 20 feet.

Yeah, GCI usually throws in a few bigger hills in an attempt to burn off all that crazy momentum.  

Just passed by KI on the way to CP (not going to have much time there tonight, but we'll be there all day tomorrow and part of Sunday) and I'm surprised at how much of MT is visible above the treeline from the freeway. I was expecting just a few feet to be above, but it's actually more like 20 feet.

Be sure to check out the work being done on Mean Streak. Word on the street (in pictures) is that they are attaching steel cross beams to the pre-lift section already.

Looking darn nice i must say.  Be interesting to see how they do the next stack of bents. They were making them largest to smallest with the smallest being on top and getting taller since they were going UP the first drop. Now if they continue with same  style they will be going from smallest to tallest in the stack since it wil be going down the lift hill...wonder how those are going stack? guess we will find out. ^_^

 

Just passed by KI on the way to CP (not going to have much time there tonight, but we'll be there all day tomorrow and part of Sunday) and I'm surprised at how much of MT is visible above the treeline from the freeway. I was expecting just a few feet to be above, but it's actually more like 20 feet.

Be sure to check out the work being done on Mean Streak. Word on the street (in pictures) is that they are attaching steel cross beams to the pre-lift section already.

 

 

There are.

Sorry if I misled. I know they are. I was suggesting that someone interested in the development of Mystic Timbers may want to check out the work being done to Mean Streak for themselves. 

I didn't think it would add to the skyline of the park, since The Beast doesn't. But now thinking about it, The Beast is farther back and it's in the hilly area of the park, so that probably has something to do with it. It's going to be awesome seeing it done and driving in, for the first time next year on opening day. :)

I don't know.  There's no info on it anywhere on the internet.  KI didn't post a lot on Banshee's stats other than its length (because its a record) when it was announced.  It's certainly steeper than Vortex.  

 

Oh, and Diamondback is 74 degrees. 

Just curious here, are they working on the hill that turns after the curving drop? Other than that, I think I'm caught up on the construction with you guys. Looks like the lift hill will be formed next week. W00T W00T! :)

What is Banshees drop angle?

Sent from my XT1585 using Tapatalk

 

Yeah, as mentioned.. the park seemed to explicitly omit a great deal of statistics for the ride. I think all we know is speed, height, length... maybe drop height?

I wish they would release more stats now that the ride isn't new. Especially since Banshee now has the largest loop in the park, and we still don't know how large it is. Before it, I think Firehawk had the largest barely beating Vortex? (which I found hard to believe, cause Vortex, though slimmer, does look quite tall)

I presume the loop on Banshee has to be at least 110'? 

I think it would've been cool if they made its first vertical loop 118' tall as an homage though.

Wait what were we talking about? :P

 

What is Banshees drop angle?

Sent from my XT1585 using Tapatalk

 

Yeah, as mentioned.. the park seemed to explicitly omit a great deal of statistics for the ride. I think all we know is speed, height, length... maybe drop height?

I wish they would release more stats now that the ride isn't new. Especially since Banshee now has the largest loop in the park, and we still don't know how large it is. Before it, I think Firehawk had the largest barely beating Vortex? (which I found hard to believe, cause Vortex, though slimmer, does look quite tall)

I presume the loop on Banshee has to be at least 110'? 

I think it would've been cool if they made its first vertical loop 118' tall as an homage though.

Wait what were we talking about? :P

 

 

According to RCDB (which has stats that match an article KI put out shortly after the announcement, its gone now since it was on Banshee's ride page), Banshee is 167 ft tall, and the drop is 150 ft, 

Checking out the webcam just a few mins ago,  they really have done a lot of work today! 

Riding Diamondback in there still out there working on it. I guess they're making an image of a good day

I'd like to know where they're going to put the crane to finish the lift.  The far side of the lift looks rather uneven to place the crane plus its a tight fit between the footings and the woods.  

As the hills get smaller, the crane should be able to reach out further without losing balance. And that's assuming they need it very much before the turn.

Also the smaller hills can be put together via forklift

Sent from my iPhone using Tapatalkdefb81be6d5f63ff22414306fb4a03c8.jpg

Guest
This topic is now closed to further replies.

Recently Browsing 0

  • No registered users viewing this page.
Background Picker

Account

Navigation

Search

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.