Jump to content

Recommended Posts

Posted

They are rolling along today. Another piece of track in the air and I'd expect to see another support and piece of track up by the end of the day.

Posted

can't tell for sure on IE, but looks like they're installing the next support now, it would be the 2nd tallest support w/n the dive loop element. Lots and lots of progress today.

Edit, switched over to firefox where I could zoom in, and I think I was wrong, doesn't look like the next support is being put in place right now, though perhaps sometime today or tomorrow? Either way, still makings lots of progress today.

  • Like 1
Posted

the chain lift loop is going to be pretty tall. the arch of the loop comes to the center of the second lift support above the catwalk but under the track, look at the birdseye animation vid and pause it when the loop comes into a good view and then from the top of the loop trace your finger to the right and it comes to the second support lift. tried to make it sound simple...

Posted

^Flight Deck.

A Abbreviation breakdown!

DB = Diamondback

SD = SurfDog ( do people use this one?)

FAAC = Flying Ace Ariel Chase

DT = Drop Tower

CF = Congo Falls

TA = (old) Thunder Alley

FH = Firehawk

FoF = Flight of Fear

AE = Adventure Express

SS = Sling Shot

VF = Viking Fury

WS = WindSeeker

ET = Eiffel Tower

WS(E) = Wood Stock Express

Some of them aren't really used, and some of them I don't have but that might help.

  • Like 4
Posted

I know it is an illusion, but Banshee looks so much bigger than FD!

What do you mean illusion? It is bigger than Flight Deck in pretty much every way.

  • Like 4
Posted

A couple might be tough, but the dive loop is definitely a good possibility. Looks like they have one support up already and are building a second on the ground right now.

Posted

With it raining today (at least down here in Cincinnati), they may not get too much done.

Posted

It was raining yesterday, they still got a lot of work done. Its not raining that hard today, they may be slowed down, but they'll still most, if not all of their scheduled work in today unless the rain/wind really pick up from where it is right now.


Posted

Yeah it's raining there now, and they have a piece of track in the air on the small crane. I'm kinda wondering if they are going to put in the track for the bottom part of the dive loop and rollout to the start of the lift loop before they top off the dive loop. Makes sense actually, that way the upper track isn't in the way when they are setting the lower track.

Guest
This topic is now closed to further replies.
  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...