Jump to content

Kings Island 2016 Discussion Thread


CoasterOhio

Recommended Posts

Technically, concrete isn`t dried.  It is cured.  It is a chemical reaction between the cement and water known as hydration (the water doesn`t evaporate, but reacts with the cement).

 

And as others stated, they likely aren`t tearing up the asphalt at this point in time.  Maybe they are sealing the asphalt, but even then, that is unlikely this close to opening.

  • Like 8
Link to comment
Share on other sites

I hope everyone who is going tonight has an awesome time. I cant wait till tomorrow even though I won't get there until probably 3 or 4pm.....that wonderful time of year is finally here again.... Warmer weather, ki opens up, rain instead of snow...... Love this time of year lol.

Sent from my SCH-I545 using Tapatalk

  • Like 10
Link to comment
Share on other sites

kind of interesting to watch things go thru the paces.  Diamondback had a train stopped at the top of the lift, another stopped at the MCBR and the 3rd stopped in the brake run.  A bunch of other rides going thru warmups.  Enjoy the evening.

  • Like 6
Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

  • Recently Browsing   0 members

    • No registered users viewing this page.
×
×
  • Create New...