sixohdieselrage Posted November 7, 2016 Share Posted November 7, 2016 ^Agreed. Wishful thinking here, but a cam from the top of MT's lifthill looking down the hill would be perfect. I think this is highly unlikely. Running Ethernet all the way up there and then across a construction site to a network connection, is asking for it. Construction will destroy the cable all the time.Who says the cam can't be wireless and connects to the WIFI there?Sent from my XT1585 using Tapatalk 3 Link to comment Share on other sites More sharing options...
WWC2003Amy Posted November 7, 2016 Share Posted November 7, 2016 Assuming they are running Ethernet and not using the available wifi Sent from my iPhone using Tapatalk 2 Link to comment Share on other sites More sharing options...
fyrfyter Posted November 7, 2016 Share Posted November 7, 2016 Assuming they are running Ethernet and not using the available wifi Sent from my iPhone using Tapatalk If it doesn't use Ethernet, then you have to run power to it. Weren't there generators all over the site, which means it's only up part of the time. In this case, PoE makes more sense than WiFi. It's the way most outdoor cameras and systems are installed. 1 Link to comment Share on other sites More sharing options...
Pagoda Gift Shop Posted November 7, 2016 Share Posted November 7, 2016 I know we are all eager to watch the construction, but the construction site is now pretty much back in the woods. I'm hoping for a good camera shot to watch the station being built, but that's about it. On the bright side, I think there is probably a good chance more construction photos will be released. 4 Link to comment Share on other sites More sharing options...
SonofBaconator Posted November 7, 2016 Share Posted November 7, 2016 Where exactly will the que be? Will it be tucked between the train and RFYLCB? 2 Link to comment Share on other sites More sharing options...
calakapepe Posted November 7, 2016 Share Posted November 7, 2016 I hope they put a camera in view of the turn around going up. I'd love to see one of those telltale GCI high banked curves go up.It doesnt seem like we're getting one! If the animation is accurate it seemed like the entrance to the turnaround didn't seem to have the nice pop like they usually have 3 Link to comment Share on other sites More sharing options...
silver2005 Posted November 7, 2016 Share Posted November 7, 2016 ^Given the rest of the layout, I'm not that worried. 7 Link to comment Share on other sites More sharing options...
jbum123 Posted November 7, 2016 Share Posted November 7, 2016 ^Agreed. Wishful thinking here, but a cam from the top of MT's lifthill looking down the hill would be perfect. I think this is highly unlikely. Running Ethernet all the way up there and then across a construction site to a network connection, is asking for it. Construction will destroy the cable all the time. And it would have to be fiber as copper will only take you to 100M. I don't thinkany people even think about the distance limitations on things like this. 2 Link to comment Share on other sites More sharing options...
steveinphoenix Posted November 7, 2016 Share Posted November 7, 2016 Sure wish we had a better view of the construction of the crossover that's going on now. 2 Link to comment Share on other sites More sharing options...
fyrfyter Posted November 7, 2016 Share Posted November 7, 2016 And it would have to be fiber as copper will only take you to 100M. I don't thinkany people even think about the distance limitations on things like this. I didn't go there, just because I figured most wouldn't understand that 300' limit, and the issue of signal degradation. I suspect most of the parks cameras are PoE, since they are mounted to existing structures that are likely on a network. 3 Link to comment Share on other sites More sharing options...
WWC2003Amy Posted November 7, 2016 Share Posted November 7, 2016 ^Agreed. Wishful thinking here, but a cam from the top of MT's lifthill looking down the hill would be perfect. I think this is highly unlikely. Running Ethernet all the way up there and then across a construction site to a network connection, is asking for it. Construction will destroy the cable all the time.And it would have to be fiber as copper will only take you to 100M.I don't thinkany people even think about the distance limitations on things like this. Actually that is why I suggested using the wireless. All the would need is power and a good signal. Sent from my iPhone using Tapatalk 2 Link to comment Share on other sites More sharing options...
fyrfyter Posted November 7, 2016 Share Posted November 7, 2016 [quote name="WWC2003Amy" Actually that is why I suggested using the wireless. All the would need is power and a good signal. Power being the other issue. I doubt they usually have power at the top of lift hills. If anything, eventually they would have a camera and probably speakers up there. 2 Link to comment Share on other sites More sharing options...
King Ding Dong Posted November 8, 2016 Share Posted November 8, 2016 ^ I don't pay a whole lot of attention to such things, but I know I have seen blue navigation lights on the tops of lift hills. You don't want the Medivac chopper crashing into you $15M coaster. 4 Link to comment Share on other sites More sharing options...
steveinphoenix Posted November 8, 2016 Share Posted November 8, 2016 I messaged Don Helbig asking him about a second webcam. He is really good about responding back to people. Great PR guy. Hopefully he will let us know soon. 4 Link to comment Share on other sites More sharing options...
fyrfyter Posted November 8, 2016 Share Posted November 8, 2016 ^ I don't pay a whole lot of attention to such things, but I know I have seen blue navigation lights on the tops of lift hills. You don't want the Medivac chopper crashing into you $15M coaster. I doubt that's a problem at KI. Nothing there is that tall. Air Care keeps the bird in Butler County. They usually don't fly that low, unless they are coming in to land. When they do land, at an Emergency LZ, they are required to make radio contact with emergency crews on the ground to advise them of any obstacles around the LZ. They request a 200x200 LZ. 100x100 is possible, but only if the pilot agrees & it's daytime. 4 Link to comment Share on other sites More sharing options...
steveinphoenix Posted November 8, 2016 Share Posted November 8, 2016 Ok everyone, i have already heard back from Don Helbig about a second cam for Mystic Timbers, this is what he said: Steve,Thank you for your interest in Mystic Timbers. It's going to be a great ride!At this time there are no plans to add a second webcam or relocate the current one to a different spot. There's not a location within the construction area of the ride to run cable from. Once the leaves have all fallen from the trees, you'll be able to see more from the current webcam location than what you can right now.We will continue to post photos and videos of the construction on Facebook, Instagram and Twitter throughout the construction of the ride. These platforms will offer first looks and the best views of the construction on Mystic Timbers. I will also have a couple of Facebook Live sessions from the construction site.Regards,Don Helbig 22 Link to comment Share on other sites More sharing options...
CoasterOhio Posted November 8, 2016 Share Posted November 8, 2016 It's not impossible to zoom in the DB Webcam, without relocating it. It's more than likely possible. 2 Link to comment Share on other sites More sharing options...
jbum123 Posted November 8, 2016 Share Posted November 8, 2016 Not all cameras can zoom just like not all of them can pan or tilt. CP cameras are PTZs. I have never seen the framing change on the DB cam so to me, that says it's a fixed. 1 Link to comment Share on other sites More sharing options...
11Nolan11 Posted November 9, 2016 Share Posted November 9, 2016 Maybe it's been noted already, but I don't recall seeing anything about it. And my apologies, for I can't figure out how to embed images on mobile. But on the Diamondback cam you can see now they've got a second crane working in between the pond and the train tracks 6 Link to comment Share on other sites More sharing options...
steveinphoenix Posted November 9, 2016 Share Posted November 9, 2016 I also wanted to add that Don Helbig also told me that the 2 Facebook Live construction updates he had mentioned would be the first one either the beginning of December or the beginning of January (they havent decided which yet) and the second would be in March. 6 Link to comment Share on other sites More sharing options...
sixohdieselrage Posted November 9, 2016 Share Posted November 9, 2016 So, the second one would darn near be on the eve of opening day? lol Sent from my XT1585 using Tapatalk 1 Link to comment Share on other sites More sharing options...
steveinphoenix Posted November 10, 2016 Share Posted November 10, 2016 So, the second one would darn near be on the eve of opening day? lol Sent from my XT1585 using Tapatalk Actually the second FB live will be sometime between March 1-5. Link to comment Share on other sites More sharing options...
fyrfyter Posted November 10, 2016 Share Posted November 10, 2016 So, the second one would darn near be on the eve of opening day? lol Sent from my XT1585 using Tapatalk Actually the second FB live will be sometime between March 1-5.The first sign of warm weather for testing?They do know Cincinnati's weather, right? 5 Link to comment Share on other sites More sharing options...
Shawn Meyer Posted November 12, 2016 Share Posted November 12, 2016 So since the park is closed now, has the park sent any new construction pictures on their website or the social media channels? Seems like everything is quiet since the world series ended. I know it's the off-season, but good grief. 2 Link to comment Share on other sites More sharing options...
IndyGuy4KI Posted November 12, 2016 Share Posted November 12, 2016 They have been posting a few pics on FB. 2 Link to comment Share on other sites More sharing options...
Magenta Lizard Posted November 12, 2016 Share Posted November 12, 2016 https://twitter.com/donhelbig/status/797155262469734400 Within the last 24 hours 8 Link to comment Share on other sites More sharing options...
CoasterOhio Posted November 13, 2016 Share Posted November 13, 2016 Just gotta know where to look. 9 Link to comment Share on other sites More sharing options...
Shawn Meyer Posted November 13, 2016 Share Posted November 13, 2016 Thanks for the update everyone. I'm so anxious for this ride that I've been having dreams about it. 4 Link to comment Share on other sites More sharing options...
CoasterOhio Posted November 13, 2016 Share Posted November 13, 2016 (edited) Via Don Helbig's Facebook. https://www.facebook.com/photo.php?fbid=10202423611189158&set=a.1003858554302.227.1760018654&type=3&theater Edited November 15, 2016 by IndyGuy4KI Adding URL 12 Link to comment Share on other sites More sharing options...
Imperial79 Posted November 13, 2016 Share Posted November 13, 2016 They are moving right along! Anyone have any guess on how much more they still need to do? Maybe 50% of the bents are up? 1 Link to comment Share on other sites More sharing options...